IAC logo
IAC Assessment: UD1088
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1088
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2024
Principal Product Fixtures, casework, furniture, and componeents
NAICS 337212 - Custom Architectural Woodwork and Millwork Manufacturing
SIC 2541 - Wood Partitions And Fixtures
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 100,000
Annual Production 1 Units
Production Hrs. Annual 4,160
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $137,166 1,323,730 kWh $0.10
Electricity Demand $14,879 5,554 kW-months/year $2.68
Electricity Fees $234 - $ -
Natural Gas $14,785 1,324 MMBtu $11.17
LPG $15,600 780 MMBtu $20.00
TOTAL ENERGY COSTS $184,221
RECOMMENDED SAVINGS* $24,292 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,165
Cost:
$953
$2,015 19,448 $150 56 - - - - $2,015
19,448
kWh
$150
56
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,698
Cost:
$6,900
$1,698 16,388 - - - - - - $1,698
16,388
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,590
Cost:
$400
$1,412 13,630 $178 67 - - - - $1,412
13,630
kWh
$178
67
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,430
Cost:
$48,200
$13,414 129,482 $1,001 374 $3,015 270 - - $13,414
129,482
kWh
$1,001
374
kW-months/year
$3,015
270
MMBtu
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,017
Cost:
-
$942 9,091 $75 28 - - - - $942
9,091
kWh
$75
28
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$392
Cost:
$1,225
- - - - - - $392 44 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$392
44
Tgal
TOTAL RECOMMENDED Savings:
$24,292
Cost:
$57,678
$19,481 188,039 $1,404 525 $3,015 270 $392 44 $19,481
188,039
kWh
$1,404
525
kW-months/year
$3,015
270
MMBtu
$392
44
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal