IAC Assessment: UD1093
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1093
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2024
Principal Product Injection Molded and Extruded Plastic Components for Motor Vehicles
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 280,000
Annual Production 13,759,000 Units
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,107,886 14,627,293 kWh $0.08
Electricity Demand $207,581 30,254 kW-months/year $6.86
Electricity Fees $17,275 - $ -
Natural Gas $46,756 8,934 MMBtu $5.23
TOTAL ENERGY COSTS $1,397,059
RECOMMENDED SAVINGS* $97,720 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$13,379
Cost:
$1,330
$12,093 159,747 $367 54 - - $919 183 $12,093
159,747
kWh
$367
54
kW-months/year
-
-
$
$919
183
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,271
Cost:
$772
$5,765 76,159 $103 15 - - $403 80 $5,765
76,159
kWh
$103
15
kW-months/year
-
-
$
$403
80
MMBtu
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,247
Cost:
$720
$6,135 81,042 $1,112 162 - - - - $6,135
81,042
kWh
$1,112
162
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,446
Cost:
$9,639
$4,610 60,900 $836 122 - - - - $4,610
60,900
kWh
$836
122
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,522
Cost:
$2,450
$2,522 33,311 - - - - - - $2,522
33,311
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,442
Cost:
$953
$1,221 16,129 $221 32 - - - - $1,221
16,129
kWh
$221
32
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$32,360
Cost:
$48,200
$28,786 380,270 $3,574 521 - - - - $28,786
380,270
kWh
$3,574
521
kW-months/year
-
-
$
-
-
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,573
Cost:
$48,200
$13,853 183,009 $1,720 251 - - - - $13,853
183,009
kWh
$1,720
251
kW-months/year
-
-
$
-
-
MMBtu
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,480
Cost:
$31,200
- - - - $13,480 - - - -
-
kWh
-
-
kW-months/year
$13,480
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$97,720
Cost:
$143,464
$74,985 990,567 $7,933 1,157 $13,480 - $1,322 263 $74,985
990,567
kWh
$7,933
1,157
kW-months/year
$13,480
-
$
$1,322
263
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas