Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2025 |
Principal Product | Aircraft Components |
NAICS | 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 112,000 |
Annual Production | 1 Units |
Production Hrs. Annual | 6,120 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $5,564,175 | 70,790,181 | kWh | $0.08 |
Electricity Demand | $599,324 | 96,727 | kW-months/year | $6.20 |
Electricity Fees | $9,452 | - | $ | - |
Natural Gas | $1,288,461 | 360,054 | MMBtu | $3.58 |
Other Energy | $9,007 | 1 | MMBtu | $9,007.00 |
TOTAL ENERGY COSTS | $8,029,554 | |||
RECOMMENDED SAVINGS* | $478,265 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Personnel Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $52,334 Cost: - |
$47,687 | 547,500 | $4,647 | 750 | - | - | - | - | - | - | - | - |
$47,687 547,500 kWh |
$4,647 750 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $1,107 Cost: $2,722 |
$1,107 | 12,740 | - | - | - | - | - | - | - | - | - | - |
$1,107 12,740 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $798 Cost: $1,000 |
$(-136) | (-1,564) | $(-29) | (-5) | $963 | 269 | - | - | - | - | - | - |
$(-136) (-1,564) kWh |
$(-29) (-5) kW-months/year |
$963 269 MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $61,605 Cost: $8,161 |
$56,008 | 644,515 | $5,597 | 900 | - | - | - | - | - | - | - | - |
$56,008 644,515 kWh |
$5,597 900 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $15,572 Cost: $16,800 |
$15,572 | 178,779 | - | - | - | - | - | - | - | - | - | - |
$15,572 178,779 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,527 Cost: $900 |
$5,036 | 57,816 | $491 | 79 | - | - | - | - | - | - | - | - |
$5,036 57,816 kWh |
$491 79 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $326,496 Cost: $385,000 |
- | - | - | - | $326,496 | 91,200 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$326,496 91,200 MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $9,007 Cost: $30,514 |
- | - | - | - | - | - | $9,007 | 1 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$9,007 1 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $5,671 Cost: - |
$3,998 | 45,900 | $1,673 | 270 | - | - | - | - | - | - | - | - |
$3,998 45,900 kWh |
$1,673 270 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $148 Cost: $449 |
$104 | 1,200 | $31 | 5 | - | - | - | - | $8 | - | $5 | - |
$104 1,200 kWh |
$31 5 kW-months/year |
- - MMBtu |
- - MMBtu |
$8 - $ |
$5 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $478,265 Cost: $445,546 |
$129,376 | 1,486,886 | $12,410 | 2,000 | $327,459 | 91,469 | $9,007 | 1 | $8 | - | $5 | - | $129,376 1,486,886 kWh |
$12,410 2,000 kW-months/year |
$327,459 91,469 MMBtu |
$9,007 1 MMBtu |
$8 - $ |
$5 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Personnel Changes | Primary Product |