IAC Assessment: UD1110
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1110
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2025
Principal Product Automotive Parts
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 650
Plant Area (Sq.Ft.) 619,000
Annual Production 1,001 Pieces
Production Hrs. Annual 6,240
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $956,371 21,820,272 kWh $0.04
Electricity Demand $65,421 40,809 kW-months/year $1.60
Electricity Fees $34,618 - $ -
Natural Gas $118,159 44,209 MMBtu $2.67
TOTAL ENERGY COSTS $1,174,569
RECOMMENDED SAVINGS* $74,481 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,358
Cost:
-
$5,940 135,614 $418 261 - - - - $5,940
135,614
kWh
$418
261
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,072
Cost:
$1,464
$2,868 65,475 $204 128 - - - - $2,868
65,475
kWh
$204
128
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,927
Cost:
$8,803
$2,553 58,285 $374 228 - - - - $2,553
58,285
kWh
$374
228
kW-months/year
-
-
$
-
-
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$961
Cost:
-
$961 21,932 - - - - - - $961
21,932
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$11,733
Cost:
$17,500
$11,733 267,874 - - - - - - $11,733
267,874
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$11,326
Cost:
$4,060
$10,573 241,383 $753 470 - - - - $10,573
241,383
kWh
$753
470
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,182
Cost:
$953
$2,039 46,550 $143 90 - - - - $2,039
46,550
kWh
$143
90
kW-months/year
-
-
$
-
-
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,078
Cost:
$19,900
$(-128) (-2,919) $(-9) (-6) - - $8,215 3,077 $(-128)
(-2,919)
kWh
$(-9)
(-6)
kW-months/year
-
-
$
$8,215
3,077
MMBtu
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$27,844
Cost:
$76,225
- - - - $27,844 - - - -
-
kWh
-
-
kW-months/year
$27,844
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$74,481
Cost:
$128,905
$36,539 834,194 $1,883 1,170 $27,844 - $8,215 3,077 $36,539
834,194
kWh
$1,883
1,170
kW-months/year
$27,844
-
$
$8,215
3,077
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas