IAC logo
IAC Assessment: UD1118
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1118
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2025
Principal Product Sensors
NAICS 334513 - Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823 - Process Control Instruments
Sales $100,000,000-$500,000,000
# of Employees 220
Plant Area (Sq.Ft.) 220,747
Annual Production 84,254 Units
Production Hrs. Annual 4,080
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $233,117 2,893,160 kWh $0.08
Electricity Demand $51,613 7,999 kW-months/year $6.45
Electricity Fees $5,265 - $ -
Natural Gas $60,624 7,556 MMBtu $8.02
TOTAL ENERGY COSTS $359,330
RECOMMENDED SAVINGS* $46,056 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Usage One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ Tgal $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,142
Cost:
-
$7,400 91,820 $1,742 270 - - - - $7,400
91,820
kWh
$1,742
270
kW-months/year
-
-
Tgal
-
-
$
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$7,958
Cost:
-
$7,958 98,730 - - - - - - $7,958
98,730
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,394
Cost:
$1,740
$3,394 41,895 - - - - - - $3,394
41,895
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$894
Cost:
-
$806 9,951 $88 14 - - - - $806
9,951
kWh
$88
14
kW-months/year
-
-
Tgal
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$723
Cost:
$2,030
$648 8,043 $75 12 - - - - $648
8,043
kWh
$75
12
kW-months/year
-
-
Tgal
-
-
$
06: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$23,759
Cost:
$18,000
- - - - $23,759 2,926 - - -
-
kWh
-
-
kW-months/year
$23,759
2,926
Tgal
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$186
Cost:
$153
$99 1,234 - - - - $87 - $99
1,234
kWh
-
-
kW-months/year
-
-
Tgal
$87
-
$
TOTAL RECOMMENDED Savings:
$46,056
Cost:
$21,923
$20,305 251,673 $1,905 295 $23,759 2,926 $87 - $20,305
251,673
kWh
$1,905
295
kW-months/year
$23,759
2,926
Tgal
$87
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Usage One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Usage One-time Revenue or Avoided Cost