Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2025 |
Principal Product | Sensors |
NAICS | 334513 - Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial |
SIC | 3823 - Process Control Instruments |
Sales | $100,000,000-$500,000,000 |
# of Employees | 220 |
Plant Area (Sq.Ft.) | 220,747 |
Annual Production | 84,254 Units |
Production Hrs. Annual | 4,080 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $233,117 | 2,893,160 | kWh | $0.08 |
Electricity Demand | $51,613 | 7,999 | kW-months/year | $6.45 |
Electricity Fees | $5,265 | - | $ | - |
Natural Gas | $60,624 | 7,556 | MMBtu | $8.02 |
TOTAL ENERGY COSTS | $359,330 | |||
RECOMMENDED SAVINGS* | $46,056 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Usage | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Water Usage | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,142 Cost: - |
$7,400 | 91,820 | $1,742 | 270 | - | - | - | - |
$7,400 91,820 kWh |
$1,742 270 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $7,958 Cost: - |
$7,958 | 98,730 | - | - | - | - | - | - |
$7,958 98,730 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $3,394 Cost: $1,740 |
$3,394 | 41,895 | - | - | - | - | - | - |
$3,394 41,895 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $894 Cost: - |
$806 | 9,951 | $88 | 14 | - | - | - | - |
$806 9,951 kWh |
$88 14 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $723 Cost: $2,030 |
$648 | 8,043 | $75 | 12 | - | - | - | - |
$648 8,043 kWh |
$75 12 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $23,759 Cost: $18,000 |
- | - | - | - | $23,759 | 2,926 | - | - |
- - kWh |
- - kW-months/year |
$23,759 2,926 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $186 Cost: $153 |
$99 | 1,234 | - | - | - | - | $87 | - |
$99 1,234 kWh |
- - kW-months/year |
- - Tgal |
$87 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $46,056 Cost: $21,923 |
$20,305 | 251,673 | $1,905 | 295 | $23,759 | 2,926 | $87 | - | $20,305 251,673 kWh |
$1,905 295 kW-months/year |
$23,759 2,926 Tgal |
$87 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Usage | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Water Usage | One-time Revenue or Avoided Cost |