IAC logo
IAC Assessment: UF0189
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0189
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1997
Principal Product Mainframe computer power supplies
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 245
Plant Area (Sq.Ft.) 32,350
Annual Production 60,512 Pieces
Production Hrs. Annual 6,552
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,293 3,075,322 kWh $0.04
Electricity Demand $61,237 6,900 kW-months/year $8.87
TOTAL ENERGY COSTS $223,030
RECOMMENDED SAVINGS* $1,522,630 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,465,123
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$7,371
Cost:
$315
$6,028 140,094 $1,343 151 - - - - - - $6,028
140,094
kWh
$1,343
151
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,181
Cost:
$4,416
$6,181 143,611 - - - - - - - - $6,181
143,611
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$425
Cost:
$800
$425 9,965 - - - - - - - - $425
9,965
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$18,074
Cost:
$74,230
$12,943 300,996 $5,131 578 - - - - - - $12,943
300,996
kWh
$5,131
578
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$904
Cost:
$700
$904 21,102 - - - - - - - - $904
21,102
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$3,500
Cost:
$1,000
- - - - - - $3,500 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$3,500
-
$
-
-
$
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$25,456
Cost:
-
- - - - $1,000 27 $24,456 - - - -
-
kWh
-
-
kW-months/year
$1,000
27
lb
$24,456
-
$
-
-
$
08: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$9,950
Cost:
$750
- - - - - - $9,950 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$9,950
-
$
-
-
$
09: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$600,000
Cost:
$15,000
- - - - - - - - $600,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$600,000
-
$
10: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$850,769
Cost:
$87,000
- - - - - - $730,769 - $120,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$730,769
-
$
$120,000
-
$
TOTAL RECOMMENDED Savings:
$1,522,630
Cost:
$184,211
$26,481 615,768 $6,474 729 $1,000 27 $768,675 - $720,000 - $26,481
615,768
kWh
$6,474
729
kW-months/year
$1,000
27
lb
$768,675
-
$
$720,000
-
$
TOTAL IMPLEMENTED Savings:
$1,465,123
Cost:
$104,450
$904 21,102 - - - - $744,219 - $720,000 - $904
21,102
kWh
-
-
kW-months/year
-
-
lb
$744,219
-
$
$720,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $