Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 1999 |
Principal Product | Underground Enclosures |
NAICS | n/a |
SIC | 2842 - Polishes And Sanitation Goods |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 220 Tons |
Production Hrs. Annual | 4,732 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $86,539 | 1,548,359 | kWh | $0.06 |
Electricity Demand | $6,686 | 4,355 | kW-months/year | $1.54 |
Other Energy | $5,157 | 295 | MMBtu | $17.48 |
TOTAL ENERGY COSTS | $171,390 | |||
RECOMMENDED SAVINGS* | $79,706 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,662 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $9,814 Cost: $13,400 |
$9,814 | 152,696 | - | - | - | - | - | - |
$9,814 152,696 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $8,490 Cost: $12,912 |
$8,490 | 135,404 | - | - | - | - | - | - |
$8,490 135,404 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,544 Cost: $1,000 |
$1,544 | 33,998 | - | - | - | - | - | - |
$1,544 33,998 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $912 Cost: - |
$912 | 14,361 | - | - | - | - | - | - |
$912 14,361 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $28,729 Cost: $25,000 |
$(-248) | (-14,947) | $(-226) | (-180) | $29,203 | 20,760 | - | - |
$(-248) (-14,947) kWh |
$(-226) (-180) kW-months/year |
$29,203 20,760 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $1,825 Cost: - |
- | - | - | - | $1,825 | 1,038 | - | - |
- - kWh |
- - kW-months/year |
$1,825 1,038 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.125 |
Savings: $28,392 Cost: $115 |
- | - | - | - | - | - | $28,392 | - |
- - kWh |
- - kW-months/year |
- - lb |
$28,392 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $79,706 Cost: $52,427 |
$20,512 | 321,512 | $(-226) | (-180) | $31,028 | 21,798 | $28,392 | - | $20,512 321,512 kWh |
$(-226) (-180) kW-months/year |
$31,028 21,798 lb |
$28,392 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,662 Cost: $14,515 |
$12,270 | 201,055 | - | - | - | - | $28,392 | - | $12,270 201,055 kWh |
- - kW-months/year |
- - lb |
$28,392 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | By-product Production |