IAC logo
IAC Assessment: UF0225
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0225
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1999
Principal Product Underground Enclosures
NAICS n/a
SIC 2842 - Polishes And Sanitation Goods
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 40,000
Annual Production 220 Tons
Production Hrs. Annual 4,732
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,539 1,548,359 kWh $0.06
Electricity Demand $6,686 4,355 kW-months/year $1.54
Other Energy $5,157 295 MMBtu $17.48
TOTAL ENERGY COSTS $171,390
RECOMMENDED SAVINGS* $79,706 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,662
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) By-product Production
$ kWh $ kW-months/year $ lb $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$9,814
Cost:
$13,400
$9,814 152,696 - - - - - - $9,814
152,696
kWh
-
-
kW-months/year
-
-
lb
-
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$8,490
Cost:
$12,912
$8,490 135,404 - - - - - - $8,490
135,404
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,544
Cost:
$1,000
$1,544 33,998 - - - - - - $1,544
33,998
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$912
Cost:
-
$912 14,361 - - - - - - $912
14,361
kWh
-
-
kW-months/year
-
-
lb
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$28,729
Cost:
$25,000
$(-248) (-14,947) $(-226) (-180) $29,203 20,760 - - $(-248)
(-14,947)
kWh
$(-226)
(-180)
kW-months/year
$29,203
20,760
lb
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$1,825
Cost:
-
- - - - $1,825 1,038 - - -
-
kWh
-
-
kW-months/year
$1,825
1,038
lb
-
-
$
07: 4.125 Savings:
$28,392
Cost:
$115
- - - - - - $28,392 - -
-
kWh
-
-
kW-months/year
-
-
lb
$28,392
-
$
TOTAL RECOMMENDED Savings:
$79,706
Cost:
$52,427
$20,512 321,512 $(-226) (-180) $31,028 21,798 $28,392 - $20,512
321,512
kWh
$(-226)
(-180)
kW-months/year
$31,028
21,798
lb
$28,392
-
$
TOTAL IMPLEMENTED Savings:
$40,662
Cost:
$14,515
$12,270 201,055 - - - - $28,392 - $12,270
201,055
kWh
-
-
kW-months/year
-
-
lb
$28,392
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) By-product Production