Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 1999 |
Principal Product | Shrimp Processing |
NAICS | n/a |
SIC | 2711 - Newspapers |
Sales | $50,000,000-$100,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 90,000 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 4,420 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $336,730 | 8,370,164 | kWh | $0.04 |
Electricity Demand | $170,186 | 21,252 | kW-months/year | $8.01 |
Natural Gas | $28,703 | 4,306 | MMBtu | $6.67 |
TOTAL ENERGY COSTS | $535,619 | |||
RECOMMENDED SAVINGS* | $14,508 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $14,508 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $983 Cost: - |
$547 | 7,620 | $58 | 1 | - | - | - | - | $378 | - |
$547 7,620 kWh |
$58 1 kW-months/year |
- - Tgal |
- - $ |
$378 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $6,086 Cost: - |
$6,086 | 83,236 | - | - | - | - | - | - | - | - |
$6,086 83,236 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $184 Cost: - |
$126 | 3,224 | $58 | 1 | - | - | - | - | - | - |
$126 3,224 kWh |
$58 1 kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4151 MINIMIZE WATER USAGE |
Savings: $566 Cost: $40 |
- | - | - | - | $566 | 152,100 | - | - | - | - |
- - kWh |
- - kW-months/year |
$566 152,100 Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.444 INSTALL SYSTEM TO COLLECT SCRAP |
Savings: $6,689 Cost: $12,000 |
- | - | - | - | $189 | 50,700 | $6,500 | - | - | - |
- - kWh |
- - kW-months/year |
$189 50,700 Tgal |
$6,500 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,508 Cost: $12,040 |
$6,759 | 94,080 | $116 | 2 | $755 | 202,800 | $6,500 | - | $378 | - | $6,759 94,080 kWh |
$116 2 kW-months/year |
$755 202,800 Tgal |
$6,500 - $ |
$378 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $14,508 Cost: $12,040 |
$6,759 | 94,080 | $116 | 2 | $755 | 202,800 | $6,500 | - | $378 | - | $6,759 94,080 kWh |
$116 2 kW-months/year |
$755 202,800 Tgal |
$6,500 - $ |
$378 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Administrative Changes | Ancillary Material Cost |