IAC logo
IAC Assessment: UF0312
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0312
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2002
Principal Product Newspapers and other publications
NAICS n/a
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 270
Plant Area (Sq.Ft.) 65,119
Annual Production 8,600,000 Pieces
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,410 3,686,880 kWh $0.06
Electricity Demand $37,112 7,429 kW-months/year $5.00
TOTAL ENERGY COSTS $262,522
RECOMMENDED SAVINGS* $65,312 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,720
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$6,162
Cost:
$7,981
$5,394 88,420 $768 13 $5,394
88,420
kWh
$768
13
kW-months/year
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,258
Cost:
$6,000
$1,258 17,976 - - $1,258
17,976
kWh
-
-
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,934
Cost:
$500
$1,934 27,671 - - $1,934
27,671
kWh
-
-
kW-months/year
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$10,427
Cost:
$20,000
$8,369 137,200 $2,058 34 $8,369
137,200
kWh
$2,058
34
kW-months/year
05: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$38,400
Cost:
$31,277
$38,400 548,572 - - $38,400
548,572
kWh
-
-
kW-months/year
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$7,131
Cost:
$1,074
$7,131 101,868 - - $7,131
101,868
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$65,312
Cost:
$66,832
$62,486 921,707 $2,826 47 $62,486
921,707
kWh
$2,826
47
kW-months/year
TOTAL IMPLEMENTED Savings:
$23,720
Cost:
$29,055
$20,894 327,488 $2,826 47 $20,894
327,488
kWh
$2,826
47
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand