IAC Assessment: UF0344
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0344
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2004
Principal Product Plastic sheets and slabs for fabrication
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 155,000
Annual Production 25,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $442,333 8,673,200 kWh $0.05
Electricity Demand $127,034 14,403 kW-months/year $8.82
Natural Gas $80,246 9,056 MMBtu $8.86
TOTAL ENERGY COSTS $649,613
RECOMMENDED SAVINGS* $45,016 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,950
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Administrative Changes Electricity Usage Natural Gas Water Disposal Administrative Changes
$ kWh $ MMBtu $ Tgal $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$21,466
Cost:
$60,000
- - $21,466 2,412 - - - - -
-
kWh
$21,466
2,412
MMBtu
-
-
Tgal
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$11,821
Cost:
-
$11,821 231,775 - - - - - - $11,821
231,775
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,950
Cost:
$490
$2,986 58,545 - - - - $(-36) - $2,986
58,545
kWh
-
-
MMBtu
-
-
Tgal
$(-36)
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,898
Cost:
-
$2,898 43,908 - - - - - - $2,898
43,908
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,795
Cost:
$6,164
$1,795 27,192 - - - - - - $1,795
27,192
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,470
Cost:
$150
$1,470 22,272 - - - - - - $1,470
22,272
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
07: 3.4155 METER WASTE WATER Savings:
$2,616
Cost:
$1,500
- - - - $2,616 483,600 - - -
-
kWh
-
-
MMBtu
$2,616
483,600
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$45,016
Cost:
$68,304
$20,970 383,692 $21,466 2,412 $2,616 483,600 $(-36) - $20,970
383,692
kWh
$21,466
2,412
MMBtu
$2,616
483,600
Tgal
$(-36)
-
$
TOTAL IMPLEMENTED Savings:
$2,950
Cost:
$490
$2,986 58,545 - - - - $(-36) - $2,986
58,545
kWh
-
-
MMBtu
-
-
Tgal
$(-36)
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Disposal Administrative Changes Electricity Usage Natural Gas Water Disposal Administrative Changes