IAC logo
IAC Assessment: UF0536
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0536
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2019
Principal Product Automotive and Marine Batteries
NAICS 335911 - Storage Battery Manufacturing
SIC 3691 - Storage Batteries
Sales $50,000,000-$100,000,000
# of Employees 260
Plant Area (Sq.Ft.) 200,000
Annual Production 6,240,000 Pieces
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,332,759 40,964,603 kWh $0.06
Electricity Demand $182,028 75,663 kW-months/year $2.41
Electricity Fees $(-3,950) - $ -
Natural Gas $80,358 40,404 MMBtu $1.99
TOTAL ENERGY COSTS $2,676,865
RECOMMENDED SAVINGS* $78,605 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$10,130
Cost:
$557
$10,130 177,724 - - - - - - - - $10,130
177,724
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$5,331
Cost:
$25,000
$3,792 66,518 $1,539 640 - - - - - - $3,792
66,518
kWh
$1,539
640
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,433
Cost:
$2,264
- - - - $3,433 1,726 - - - - -
-
kWh
-
-
kW-months/year
$3,433
1,726
MMBtu
-
-
$
-
-
$
04: 2.2615 CLEAN CONDENSER TUBES Savings:
$4,554
Cost:
$4,248
$4,554 79,897 - - - - - - - - $4,554
79,897
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 4.631 INSTALL AN UNINTERUPTABLE POWER SUPPLY Savings:
$25,860
Cost:
$33,265
$(-1,140) (-20,000) - - - - $27,000 - - - $(-1,140)
(-20,000)
kWh
-
-
kW-months/year
-
-
MMBtu
$27,000
-
$
-
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$18,000
Cost:
$18,548
- - - - - - $18,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$18,000
-
$
-
-
$
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$11,297
Cost:
$3,028
- - - - - - - - $11,297 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$11,297
-
$
TOTAL RECOMMENDED Savings:
$78,605
Cost:
$86,910
$17,336 304,139 $1,539 640 $3,433 1,726 $45,000 - $11,297 - $17,336
304,139
kWh
$1,539
640
kW-months/year
$3,433
1,726
MMBtu
$45,000
-
$
$11,297
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material