Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2020 |
Principal Product | Soft Drinks |
NAICS | 312111 - Soft Drink Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 400,400 |
Annual Production | 19,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,719,864 | 19,107,600 | kWh | $0.09 |
Natural Gas | $108,465 | 19,438 | MMBtu | $5.58 |
TOTAL ENERGY COSTS | $1,886,068 | |||
RECOMMENDED SAVINGS* | $444,327 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $444,327 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Primary Product | Electricity Usage | Natural Gas | Administrative Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $41,888 Cost: $29,990 |
$41,888 | 465,420 | - | - | - | - | - | - |
$41,888 465,420 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS |
Savings: $11,802 Cost: $30,000 |
- | - | $11,802 | 2,115 | - | - | - | - |
- - kWh |
$11,802 2,115 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1222 INSTALL TURBULATORS |
Savings: $3,921 Cost: $11,250 |
- | - | $3,921 | 703 | - | - | - | - |
- - kWh |
$3,921 703 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,928 Cost: $2,800 |
- | - | $2,928 | 525 | - | - | - | - |
- - kWh |
$2,928 525 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.522 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE |
Savings: $383,788 Cost: $897,972 |
$(-160,203) | (-1,780,030) | $(-9,490) | (-1,701) | $(-2,509,019) | - | $3,062,500 | - |
$(-160,203) (-1,780,030) kWh |
$(-9,490) (-1,701) MMBtu |
$(-2,509,019) - $ |
$3,062,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $444,327 Cost: $972,012 |
$(-118,315) | (-1,314,610) | $9,161 | 1,642 | $(-2,509,019) | - | $3,062,500 | - | $(-118,315) (-1,314,610) kWh |
$9,161 1,642 MMBtu |
$(-2,509,019) - $ |
$3,062,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $444,327 Cost: $972,012 |
$(-118,315) | (-1,314,610) | $9,161 | 1,642 | $(-2,509,019) | - | $3,062,500 | - | $(-118,315) (-1,314,610) kWh |
$9,161 1,642 MMBtu |
$(-2,509,019) - $ |
$3,062,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Primary Product | Electricity Usage | Natural Gas | Administrative Changes | Primary Product |