IAC logo
IAC Assessment: UF0553
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0553
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2020
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 2
Plant Area (Sq.Ft.) 25,500
Annual Production 118,990,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $77,723 2,391,480 kWh $0.03
Electricity Demand $32,273 5,423 kW-months/year $5.95
TOTAL ENERGY COSTS $109,996
RECOMMENDED SAVINGS* $425,876 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,186
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes By-product Production Electricity Usage Electricity Demand Administrative Changes By-product Production
$ kWh $ kW-months/year $ $ $ $
01: 4.446 AUTOMATE FINISHING PROCESS Savings:
$20,196
Cost:
$46,226
$20,196 612,014 - - - - - - $20,196
612,014
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,460
Cost:
$28,443
$6,460 195,758 - - - - - - $6,460
195,758
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$1,490
Cost:
$5,608
$1,490 45,156 - - - - - - $1,490
45,156
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$395,494
Cost:
$1,875,550
$(-3,614) (-109,500) $(-892) (-150) - - $400,000 - $(-3,614)
(-109,500)
kWh
$(-892)
(-150)
kW-months/year
-
-
$
$400,000
-
$
05: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$2,236
Cost:
-
- - - - $2,236 - - - -
-
kWh
-
-
kW-months/year
$2,236
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$425,876
Cost:
$1,955,827
$24,532 743,428 $(-892) (-150) $2,236 - $400,000 - $24,532
743,428
kWh
$(-892)
(-150)
kW-months/year
$2,236
-
$
$400,000
-
$
TOTAL IMPLEMENTED Savings:
$10,186
Cost:
$34,051
$7,950 240,914 - - $2,236 - - - $7,950
240,914
kWh
-
-
kW-months/year
$2,236
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes By-product Production Electricity Usage Electricity Demand Administrative Changes By-product Production