IAC logo
IAC Assessment: UL0169
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0169
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1996
Principal Product Offset Printing
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 70,000
Annual Production 900,000 Pounds
Production Hrs. Annual 8,400
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,574 1,170,574 kWh $0.05
Electricity Demand $31,988 3,345 kW-months/year $9.56
Natural Gas $2,021 517 MMBtu $3.91
TOTAL ENERGY COSTS $99,183
RECOMMENDED SAVINGS* $14,406 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,742
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,640
Cost:
$3,694
- - $6,640 - - - - - - - - - -
-
kWh
$6,640
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,562
Cost:
$20
$1,094 38,687 $468 62 - - - - - - - - $1,094
38,687
kWh
$468
62
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$102
Cost:
$200
- - - - $102 26 - - - - - - -
-
kWh
-
-
kW-months/year
$102
26
MMBtu
-
-
lb
-
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,300
Cost:
-
- - - - - - - - $2,300 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$2,300
-
$
-
-
$
05: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$3,802
Cost:
$500
- - - - - - $52 25,000 - - $3,750 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$52
25,000
lb
-
-
$
$3,750
-
$
TOTAL RECOMMENDED Savings:
$14,406
Cost:
$4,414
$1,094 38,687 $7,108 62 $102 26 $52 25,000 $2,300 - $3,750 - $1,094
38,687
kWh
$7,108
62
kW-months/year
$102
26
MMBtu
$52
25,000
lb
$2,300
-
$
$3,750
-
$
TOTAL IMPLEMENTED Savings:
$6,742
Cost:
$3,894
- - $6,640 - $102 26 - - - - - - -
-
kWh
$6,640
-
kW-months/year
$102
26
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Raw Material