Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1997 |
Principal Product | Diesel Engine Parts and Machining |
NAICS | n/a |
SIC | 3535 - Conveyors And Conveying Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 94,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 7,488 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $68,745 | 2,472,450 | kWh | $0.03 |
Electricity Demand | $61,869 | 6,882 | kW-months/year | $8.99 |
Natural Gas | $109,413 | 22,138 | MMBtu | $4.94 |
TOTAL ENERGY COSTS | $249,127 | |||
RECOMMENDED SAVINGS* | $71,382 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Solid Waste (haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Solid Waste (haz) | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,187 Cost: $20 |
$628 | 25,791 | $559 | 62 | - | - | - | - | - | - | - | - |
$628 25,791 kWh |
$559 62 kW-months/year |
- - $ |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $15,253 Cost: $24,173 |
- | - | - | - | $15,253 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$15,253 - $ |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.8211 CONVERT TO AQUEOUS CLEANING SYSTEM |
Savings: $8,500 Cost: $12,200 |
- | - | - | - | - | - | $8,500 | 2,160 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$8,500 2,160 lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $23,221 Cost: $9,100 |
- | - | - | - | - | - | - | - | $23,221 | 5,760 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - lb |
$23,221 5,760 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.651 INSTALL BACK-UP EQUIPMENT |
Savings: $23,221 Cost: $8,900 |
- | - | - | - | - | - | - | - | $1,009 | 288 | $22,212 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - lb |
$1,009 288 lb |
$22,212 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $71,382 Cost: $54,393 |
$628 | 25,791 | $559 | 62 | $15,253 | - | $8,500 | 2,160 | $24,230 | 6,048 | $22,212 | - | $628 25,791 kWh |
$559 62 kW-months/year |
$15,253 - $ |
$8,500 2,160 lb |
$24,230 6,048 lb |
$22,212 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Solid Waste (haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Solid Waste (haz) | Primary Raw Material |