IAC logo
IAC Assessment: UL0182
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0182
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1997
Principal Product Diesel Engine Parts and Machining
NAICS n/a
SIC 3535 - Conveyors And Conveying Equipment
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 94,000
Annual Production 0 Units
Production Hrs. Annual 7,488
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,745 2,472,450 kWh $0.03
Electricity Demand $61,869 6,882 kW-months/year $8.99
Natural Gas $109,413 22,138 MMBtu $4.94
TOTAL ENERGY COSTS $249,127
RECOMMENDED SAVINGS* $71,382 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Solid Waste (haz) Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Solid Waste (haz) Primary Raw Material
$ kWh $ kW-months/year $ $ $ lb $ lb $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,187
Cost:
$20
$628 25,791 $559 62 - - - - - - - - $628
25,791
kWh
$559
62
kW-months/year
-
-
$
-
-
lb
-
-
lb
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$15,253
Cost:
$24,173
- - - - $15,253 - - - - - - - -
-
kWh
-
-
kW-months/year
$15,253
-
$
-
-
lb
-
-
lb
-
-
$
03: 3.8211 CONVERT TO AQUEOUS CLEANING SYSTEM Savings:
$8,500
Cost:
$12,200
- - - - - - $8,500 2,160 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,500
2,160
lb
-
-
lb
-
-
$
04: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$23,221
Cost:
$9,100
- - - - - - - - $23,221 5,760 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$23,221
5,760
lb
-
-
$
05: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$23,221
Cost:
$8,900
- - - - - - - - $1,009 288 $22,212 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$1,009
288
lb
$22,212
-
$
TOTAL RECOMMENDED Savings:
$71,382
Cost:
$54,393
$628 25,791 $559 62 $15,253 - $8,500 2,160 $24,230 6,048 $22,212 - $628
25,791
kWh
$559
62
kW-months/year
$15,253
-
$
$8,500
2,160
lb
$24,230
6,048
lb
$22,212
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Solid Waste (haz) Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Solid Waste (haz) Primary Raw Material