IAC logo
IAC Assessment: UL0192
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0192
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1998
Principal Product Metal Building Components
NAICS n/a
SIC 3448 - Prefabricated Metal Buildings
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 212,500
Annual Production 41,000,000 Pounds
Production Hrs. Annual 4,576
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,513 2,189,918 kWh $0.02
Electricity Demand $66,302 9,054 kW-months/year $7.32
TOTAL ENERGY COSTS $134,106
RECOMMENDED SAVINGS* $481,760 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,283
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,015
Cost:
$20
$576 24,033 $439 60 - - - - $576
24,033
kWh
$439
60
kW-months/year
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$185
Cost:
$152
$96 4,103 $89 12 - - - - $96
4,103
kWh
$89
12
kW-months/year
-
-
lb
-
-
$
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,083
Cost:
-
- - - - $5,083 123,000 - - -
-
kWh
-
-
kW-months/year
$5,083
123,000
lb
-
-
$
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,977
Cost:
-
- - - - $2,977 75,000 - - -
-
kWh
-
-
kW-months/year
$2,977
75,000
lb
-
-
$
05: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$472,500
Cost:
$705,000
- - - - - - $472,500 - -
-
kWh
-
-
kW-months/year
-
-
lb
$472,500
-
$
TOTAL RECOMMENDED Savings:
$481,760
Cost:
$705,172
$672 28,136 $528 72 $8,060 198,000 $472,500 - $672
28,136
kWh
$528
72
kW-months/year
$8,060
198,000
lb
$472,500
-
$
TOTAL IMPLEMENTED Savings:
$6,283
Cost:
$172
$672 28,136 $528 72 $5,083 123,000 - - $672
28,136
kWh
$528
72
kW-months/year
$5,083
123,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes