Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1998 |
Principal Product | isolated soy protein |
NAICS | n/a |
SIC | 2075 - Soybean Oil Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 96 |
Plant Area (Sq.Ft.) | 113,000 |
Annual Production | 45,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $667,544 | 26,655,335 | kWh | $0.03 |
Electricity Demand | $351,329 | 100,224 | kW-months/year | $3.51 |
Natural Gas | $1,795,015 | 457,045 | MMBtu | $3.93 |
TOTAL ENERGY COSTS | $2,895,985 | |||
RECOMMENDED SAVINGS* | $6,890,868 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $177,628 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,850 Cost: $20 |
$6,541 | 261,137 | $1,309 | 373 | - | - | - | - | - | - | - | - | - | - | - | - |
$6,541 261,137 kWh |
$1,309 373 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $4,732 Cost: $260 |
$3,942 | 157,386 | $790 | 255 | - | - | - | - | - | - | - | - | - | - | - | - |
$3,942 157,386 kWh |
$790 255 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $6,368 Cost: $800 |
- | - | - | - | $6,368 | 1,654 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,368 1,654 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $2,628 Cost: - |
- | - | - | - | - | - | - | - | $2,628 | 126,000 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$2,628 126,000 lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $6,458,418 Cost: $3,180,000 |
- | - | - | - | $1,094,959 | 286,171 | $5,363,459 | 27,720,525 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,094,959 286,171 MMBtu |
$5,363,459 27,720,525 Tgal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4151 MINIMIZE WATER USAGE |
Savings: $235,872 Cost: $666,500 |
- | - | - | - | - | - | $151,956 | 75,600,000 | - | - | - | - | $83,916 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$151,956 75,600,000 Tgal |
- - lb |
- - $ |
$83,916 - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.624 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME |
Savings: $70,000 Cost: - |
- | - | - | - | - | - | - | - | - | - | $70,000 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$70,000 - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.512 CONDENSE OPERATION INTO ONE BUILDING |
Savings: $105,000 Cost: $300,000 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $105,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
$105,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $6,890,868 Cost: $4,147,580 |
$10,483 | 418,523 | $2,099 | 628 | $1,101,327 | 287,825 | $5,515,415 | 103,320,525 | $2,628 | 126,000 | $70,000 | - | $83,916 | - | $105,000 | - | $10,483 418,523 kWh |
$2,099 628 kW-months/year |
$1,101,327 287,825 MMBtu |
$5,515,415 103,320,525 Tgal |
$2,628 126,000 lb |
$70,000 - $ |
$83,916 - Tgal |
$105,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $177,628 Cost: $300,000 |
- | - | - | - | - | - | - | - | $2,628 | 126,000 | $70,000 | - | - | - | $105,000 | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$2,628 126,000 lb |
$70,000 - $ |
- - Tgal |
$105,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Primary Product |