IAC Assessment: UL0195
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0195
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1998
Principal Product isolated soy protein
NAICS n/a
SIC 2075 - Soybean Oil Mills
Sales $10,000,000-$50,000,000
# of Employees 96
Plant Area (Sq.Ft.) 113,000
Annual Production 45,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $667,544 26,655,335 kWh $0.03
Electricity Demand $351,329 100,224 kW-months/year $3.51
Natural Gas $1,795,015 457,045 MMBtu $3.93
TOTAL ENERGY COSTS $2,895,985
RECOMMENDED SAVINGS* $6,890,868 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $177,628
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Water Consumption Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ Tgal $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,850
Cost:
$20
$6,541 261,137 $1,309 373 - - - - - - - - - - - - $6,541
261,137
kWh
$1,309
373
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,732
Cost:
$260
$3,942 157,386 $790 255 - - - - - - - - - - - - $3,942
157,386
kWh
$790
255
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,368
Cost:
$800
- - - - $6,368 1,654 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$6,368
1,654
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
04: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$2,628
Cost:
-
- - - - - - - - $2,628 126,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,628
126,000
lb
-
-
$
-
-
Tgal
-
-
$
05: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$6,458,418
Cost:
$3,180,000
- - - - $1,094,959 286,171 $5,363,459 27,720,525 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,094,959
286,171
MMBtu
$5,363,459
27,720,525
Tgal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$235,872
Cost:
$666,500
- - - - - - $151,956 75,600,000 - - - - $83,916 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$151,956
75,600,000
Tgal
-
-
lb
-
-
$
$83,916
-
Tgal
-
-
$
07: 4.6240 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME Savings:
$70,000
Cost:
-
- - - - - - - - - - $70,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$70,000
-
$
-
-
Tgal
-
-
$
08: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$105,000
Cost:
$300,000
- - - - - - - - - - - - - - $105,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
$105,000
-
$
TOTAL RECOMMENDED Savings:
$6,890,868
Cost:
$4,147,580
$10,483 418,523 $2,099 628 $1,101,327 287,825 $5,515,415 103,320,525 $2,628 126,000 $70,000 - $83,916 - $105,000 - $10,483
418,523
kWh
$2,099
628
kW-months/year
$1,101,327
287,825
MMBtu
$5,515,415
103,320,525
Tgal
$2,628
126,000
lb
$70,000
-
$
$83,916
-
Tgal
$105,000
-
$
TOTAL IMPLEMENTED Savings:
$177,628
Cost:
$300,000
- - - - - - - - $2,628 126,000 $70,000 - - - $105,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,628
126,000
lb
$70,000
-
$
-
-
Tgal
$105,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Water Consumption Primary Product