Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1998 |
Principal Product | automotive engine head gasket |
NAICS | n/a |
SIC | 3053 - Gaskets, Packing And Sealing Devices |
Sales | $50,000,000-$100,000,000 |
# of Employees | 201 |
Plant Area (Sq.Ft.) | 69,000 |
Annual Production | 40,000,000 Pieces |
Production Hrs. Annual | 5,880 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $232,905 | 8,168,816 | kWh | $0.03 |
Electricity Demand | $68,224 | 1,365 | kW-months/year | $49.98 |
Natural Gas | $40,679 | 8,020 | MMBtu | $5.07 |
TOTAL ENERGY COSTS | $411,638 | |||
RECOMMENDED SAVINGS* | $1,025,315 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $342,958 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $958 Cost: $3,132 |
- | - | $958 | - | - | - | - | - | - | - |
- - kWh |
$958 - kW-months/year |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,962 Cost: $1,518 |
$3,017 | 105,803 | $945 | 212 | - | - | - | - | - | - |
$3,017 105,803 kWh |
$945 212 kW-months/year |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $2,084 Cost: $5,160 |
- | - | - | - | - | - | $2,084 | 30,032 | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$2,084 30,032 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.7135 MINIMIZE USE OF RAGS THROUGH WORKER TRAINING |
Savings: $4,045 Cost: $1,125 |
- | - | - | - | - | - | $4,045 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$4,045 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $672,266 Cost: $138,250 |
- | - | - | - | $672,266 | 2,301,312 | - | - | - | - |
- - kWh |
- - kW-months/year |
$672,266 2,301,312 lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL |
Savings: $342,000 Cost: $12,150 |
- | - | - | - | - | - | - | - | $342,000 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - lb |
$342,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,025,315 Cost: $161,335 |
$3,017 | 105,803 | $1,903 | 212 | $672,266 | 2,301,312 | $6,129 | 30,032 | $342,000 | - | $3,017 105,803 kWh |
$1,903 212 kW-months/year |
$672,266 2,301,312 lb |
$6,129 30,032 lb |
$342,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $342,958 Cost: $15,282 |
- | - | $958 | - | - | - | - | - | $342,000 | - | - - kWh |
$958 - kW-months/year |
- - lb |
- - lb |
$342,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes |