IAC logo
IAC Assessment: UL0203
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0203
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1998
Principal Product Shelving from cold rolled steel
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 120,000
Annual Production 30,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,408 4,605,803 kWh $0.03
Electricity Demand $78,241 9,528 kW-months/year $8.21
Electricity Fees $21,819 - $ -
Natural Gas $109,509 33,874 MMBtu $3.23
TOTAL ENERGY COSTS $373,817
RECOMMENDED SAVINGS* $229,577 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,777
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product
$ kWh $ MMBtu $ lb $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,115
Cost:
$65
$2,115 50,410 - - - - - - $2,115
50,410
kWh
-
-
MMBtu
-
-
lb
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,100
Cost:
$20,100
- - $9,100 3,060 - - - - -
-
kWh
$9,100
3,060
MMBtu
-
-
lb
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$762
Cost:
$15
$762 15,533 - - - - - - $762
15,533
kWh
-
-
MMBtu
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$17,900
Cost:
$8,860
- - - - $17,900 567,000 - - -
-
kWh
-
-
MMBtu
$17,900
567,000
lb
-
-
$
05: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$109,700
Cost:
$16,000
- - - - $109,700 72,900 - - -
-
kWh
-
-
MMBtu
$109,700
72,900
lb
-
-
$
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$90,000
Cost:
$155,600
- - - - - - $90,000 - -
-
kWh
-
-
MMBtu
-
-
lb
$90,000
-
$
TOTAL RECOMMENDED Savings:
$229,577
Cost:
$200,640
$2,877 65,943 $9,100 3,060 $127,600 639,900 $90,000 - $2,877
65,943
kWh
$9,100
3,060
MMBtu
$127,600
639,900
lb
$90,000
-
$
TOTAL IMPLEMENTED Savings:
$20,777
Cost:
$8,940
$2,877 65,943 - - $17,900 567,000 - - $2,877
65,943
kWh
-
-
MMBtu
$17,900
567,000
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product