Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1998 |
Principal Product | Magnet Wire |
NAICS | n/a |
SIC | 3357 - Nonferrous Wiredrawing & Insulating |
Sales | $50,000,000-$100,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 35,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $417,935 | 19,724,502 | kWh | $0.02 |
Electricity Demand | $184,460 | 35,442 | kW-months/year | $5.20 |
Natural Gas | $598,229 | 149,730 | MMBtu | $4.00 |
TOTAL ENERGY COSTS | $1,290,624 | |||
RECOMMENDED SAVINGS* | $392,501 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $312,001 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $3,709 Cost: $120 |
$2,120 | 100,234 | $59 | 11 | - | - | - | - | $450 | - | $1,080 | - | - | - |
$2,120 100,234 kWh |
$59 11 kW-months/year |
- - MMBtu |
- - lb |
$450 - $ |
$1,080 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,492 Cost: $20 |
$1,081 | 55,393 | $411 | 79 | - | - | - | - | - | - | - | - | - | - |
$1,081 55,393 kWh |
$411 79 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR |
Savings: $74,500 Cost: $163,800 |
- | - | - | - | $74,500 | 18,790 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$74,500 18,790 MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $6,000 Cost: $1,320 |
- | - | - | - | - | - | $6,000 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$6,000 - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS |
Savings: $306,800 Cost: $117,500 |
- | - | - | - | - | - | - | - | - | - | - | - | $306,800 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
$306,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $392,501 Cost: $282,760 |
$3,201 | 155,627 | $470 | 90 | $74,500 | 18,790 | $6,000 | - | $450 | - | $1,080 | - | $306,800 | - | $3,201 155,627 kWh |
$470 90 kW-months/year |
$74,500 18,790 MMBtu |
$6,000 - lb |
$450 - $ |
$1,080 - $ |
$306,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $312,001 Cost: $117,640 |
$3,201 | 155,627 | $470 | 90 | - | - | - | - | $450 | - | $1,080 | - | $306,800 | - | $3,201 155,627 kWh |
$470 90 kW-months/year |
- - MMBtu |
- - lb |
$450 - $ |
$1,080 - $ |
$306,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Primary Product |