Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1998 |
Principal Product | Plastic refrigerator parts |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 375 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 15,000,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $395,199 | 11,486,811 | kWh | $0.03 |
Electricity Demand | $146,047 | 11,915 | kW-months/year | $12.26 |
Electricity Fees | $71,080 | - | $ | - |
Natural Gas | $18,800 | 3,438 | MMBtu | $5.47 |
TOTAL ENERGY COSTS | $656,726 | |||
RECOMMENDED SAVINGS* | $35,584 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Other Liquid (non-haz) | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Electricity Fees | Other Liquid (non-haz) | Solid Waste (non-haz) | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,802 Cost: $100 |
$907 | 26,377 | $895 | 73 | - | - | - | - | - | - | - | - |
$907 26,377 kWh |
$895 73 kW-months/year |
- - $ |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $3,040 Cost: $2,176 |
- | - | - | - | $3,040 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,040 - $ |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.7135 MINIMIZE USE OF RAGS THROUGH WORKER TRAINING |
Savings: $3,175 Cost: $1,625 |
- | - | - | - | - | - | - | - | $3,175 | 12,740 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - gal |
$3,175 12,740 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $1,567 Cost: $5,070 |
- | - | - | - | - | - | $1,567 | 12,750 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$1,567 12,750 gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $26,000 Cost: $3,120 |
- | - | - | - | - | - | - | - | - | - | $26,000 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - gal |
- - lb |
$26,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,584 Cost: $12,091 |
$907 | 26,377 | $895 | 73 | $3,040 | - | $1,567 | 12,750 | $3,175 | 12,740 | $26,000 | - | $907 26,377 kWh |
$895 73 kW-months/year |
$3,040 - $ |
$1,567 12,750 gal |
$3,175 12,740 lb |
$26,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Other Liquid (non-haz) | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Electricity Fees | Other Liquid (non-haz) | Solid Waste (non-haz) | By-product Production |