IAC logo
IAC Assessment: UL0217
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0217
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1999
Principal Product Corrugated Packaging
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 174,000
Annual Production 583,000,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $144,782 5,906,800 kWh $0.02
Electricity Demand $122,624 13,441 kW-months/year $9.12
Electricity Fees $3,300 - $ -
Natural Gas $4,722 911 MMBtu $5.18
TOTAL ENERGY COSTS $(-20,142)
RECOMMENDED SAVINGS* $22,756 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Water Consumption Electricity Usage Electricity Demand Other Liquid (non-haz) Water Consumption
$ kWh $ kW-months/year $ gal $ Tgal
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,519
Cost:
$131
$871 35,463 $648 71 - - - - $871
35,463
kWh
$648
71
kW-months/year
-
-
gal
-
-
Tgal
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,126
Cost:
$20
$1,219 49,824 $907 99 - - - - $1,219
49,824
kWh
$907
99
kW-months/year
-
-
gal
-
-
Tgal
03: 3.4155 METER WASTE WATER Savings:
$4,300
Cost:
-
- - - - - - $4,300 - -
-
kWh
-
-
kW-months/year
-
-
gal
$4,300
-
Tgal
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$14,811
Cost:
$4,765
- - - - $14,811 10,000 - - -
-
kWh
-
-
kW-months/year
$14,811
10,000
gal
-
-
Tgal
TOTAL RECOMMENDED Savings:
$22,756
Cost:
$4,916
$2,090 85,287 $1,555 170 $14,811 10,000 $4,300 - $2,090
85,287
kWh
$1,555
170
kW-months/year
$14,811
10,000
gal
$4,300
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ gal $ Tgal
Electricity Usage Electricity Demand Other Liquid (non-haz) Water Consumption Electricity Usage Electricity Demand Other Liquid (non-haz) Water Consumption