Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1999 |
Principal Product | Injection Molded Automotive Parts |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 35,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $184,802 | 5,067,409 | kWh | $0.04 |
Electricity Demand | $44,668 | 1,173 | kW-months/year | $38.08 |
Electricity Fees | $425 | - | $ | - |
Natural Gas | $3,278 | 496 | MMBtu | $6.61 |
TOTAL ENERGY COSTS | $241,047 | |||
RECOMMENDED SAVINGS* | $20,197 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,197 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $563 Cost: $20 |
$473 | 12,896 | $90 | 25 | - | - | - | - |
$473 12,896 kWh |
$90 25 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $8,356 Cost: $24,627 |
- | - | $8,356 | 2,280 | - | - | - | - |
- - kWh |
$8,356 2,280 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $191 Cost: - |
- | - | - | - | $191 | 15,300 | - | - |
- - kWh |
- - kW-months/year |
$191 15,300 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4155 METER WASTE WATER |
Savings: $4,053 Cost: - |
- | - | - | - | - | - | $4,053 | - |
- - kWh |
- - kW-months/year |
- - lb |
$4,053 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $2,520 Cost: $300 |
- | - | - | - | - | - | $2,520 | - |
- - kWh |
- - kW-months/year |
- - lb |
$2,520 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.421 MODIFY CURRENT INCENTIVE PROGRAM |
Savings: $4,514 Cost: $60 |
- | - | - | - | - | - | $4,514 | - |
- - kWh |
- - kW-months/year |
- - lb |
$4,514 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $20,197 Cost: $25,007 |
$473 | 12,896 | $8,446 | 2,305 | $191 | 15,300 | $11,087 | - | $473 12,896 kWh |
$8,446 2,305 kW-months/year |
$191 15,300 lb |
$11,087 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,197 Cost: $25,007 |
$473 | 12,896 | $8,446 | 2,305 | $191 | 15,300 | $11,087 | - | $473 12,896 kWh |
$8,446 2,305 kW-months/year |
$191 15,300 lb |
$11,087 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes |