IAC logo
IAC Assessment: UL0219
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0219
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1999
Principal Product Injection Molded Automotive Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 60,000
Annual Production 35,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $184,802 5,067,409 kWh $0.04
Electricity Demand $44,668 1,173 kW-months/year $38.08
Electricity Fees $425 - $ -
Natural Gas $3,278 496 MMBtu $6.61
TOTAL ENERGY COSTS $241,047
RECOMMENDED SAVINGS* $20,197 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,197
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$563
Cost:
$20
$473 12,896 $90 25 - - - - $473
12,896
kWh
$90
25
kW-months/year
-
-
lb
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,356
Cost:
$24,627
- - $8,356 2,280 - - - - -
-
kWh
$8,356
2,280
kW-months/year
-
-
lb
-
-
$
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$191
Cost:
-
- - - - $191 15,300 - - -
-
kWh
-
-
kW-months/year
$191
15,300
lb
-
-
$
04: 3.4155 METER WASTE WATER Savings:
$4,053
Cost:
-
- - - - - - $4,053 - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,053
-
$
05: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$2,520
Cost:
$300
- - - - - - $2,520 - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,520
-
$
06: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$4,514
Cost:
$60
- - - - - - $4,514 - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,514
-
$
TOTAL RECOMMENDED Savings:
$20,197
Cost:
$25,007
$473 12,896 $8,446 2,305 $191 15,300 $11,087 - $473
12,896
kWh
$8,446
2,305
kW-months/year
$191
15,300
lb
$11,087
-
$
TOTAL IMPLEMENTED Savings:
$20,197
Cost:
$25,007
$473 12,896 $8,446 2,305 $191 15,300 $11,087 - $473
12,896
kWh
$8,446
2,305
kW-months/year
$191
15,300
lb
$11,087
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes