Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1999
Principal Product Aerial Boom Devices
NAICS n/a
SIC 3535 - Conveyors And Conveying Equipment
Sales $1,000,000-$5,000,000
# of Employees 63
Plant Area (Sq.Ft.) 56,000
Annual Production 2,000 Pieces
Production Hrs. Annual 4,050
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,459 1,600,234 kWh $0.03
Electricity Demand $27,479 8,086 kW-months/year $3.40
Natural Gas $35,419 7,610 MMBtu $4.65
TOTAL ENERGY COSTS $131,435
RECOMMENDED SAVINGS* $82,242 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,404
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost By-product Production Electricity Usage Electricity Demand One-time Revenue or Avoided Cost By-product Production
$ kWh $ kW-months/year $ $ $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$157
Cost:
$65
$95 3,224 $62 11 - - - - $95
3,224
kWh
$62
11
kW-months/year
-
-
$
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$503
Cost:
$400
$503 30,774 - - - - - - $503
30,774
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$183
Cost:
$20
$108 3,224 $75 22 - - - - $108
3,224
kWh
$75
22
kW-months/year
-
-
$
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$40,406
Cost:
$8,165
- - - - $40,406 - - - -
-
kWh
-
-
kW-months/year
$40,406
-
$
-
-
$
05: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$18,655
Cost:
$1,448
- - - - $18,655 - - - -
-
kWh
-
-
kW-months/year
$18,655
-
$
-
-
$
06: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$22,338
Cost:
$5,000
- - - - - - $22,338 - -
-
kWh
-
-
kW-months/year
-
-
$
$22,338
-
$
TOTAL RECOMMENDED Savings:
$82,242
Cost:
$15,098
$706 37,222 $137 33 $59,061 - $22,338 - $706
37,222
kWh
$137
33
kW-months/year
$59,061
-
$
$22,338
-
$
TOTAL IMPLEMENTED Savings:
$63,404
Cost:
$13,630
$598 33,998 $62 11 $40,406 - $22,338 - $598
33,998
kWh
$62
11
kW-months/year
$40,406
-
$
$22,338
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost By-product Production Electricity Usage Electricity Demand One-time Revenue or Avoided Cost By-product Production