IAC logo
IAC Assessment: UL0225
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0225
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1999
Principal Product Custon hardwood furniture pieces
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 162
Plant Area (Sq.Ft.) 138,000
Annual Production 3,500 Thousand Feet
Production Hrs. Annual 6,452
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,081 3,362,544 kWh $0.03
Electricity Demand $106,450 10,797 kW-months/year $9.86
Natural Gas $35,131 8,127 MMBtu $4.32
TOTAL ENERGY COSTS $269,515
RECOMMENDED SAVINGS* $294,478 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,666
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$22,666
Cost:
$14,656
- - - - $22,666 - - - - - -
-
kWh
-
-
kW-months/year
$22,666
-
$
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$742
Cost:
$65
$428 16,999 $314 32 - - - - - - $428
16,999
kWh
$314
32
kW-months/year
-
-
$
-
-
lb
-
-
$
03: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$135,070
Cost:
$761,380
$78,416 2,862,837 $41,950 - - - $14,704 8,860,500 - - $78,416
2,862,837
kWh
$41,950
-
kW-months/year
-
-
$
$14,704
8,860,500
lb
-
-
$
04: 4.2120 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$136,000
Cost:
$143,925
- - - - - - - - $136,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$136,000
-
$
TOTAL RECOMMENDED Savings:
$294,478
Cost:
$920,026
$78,844 2,879,836 $42,264 32 $22,666 - $14,704 8,860,500 $136,000 - $78,844
2,879,836
kWh
$42,264
32
kW-months/year
$22,666
-
$
$14,704
8,860,500
lb
$136,000
-
$
TOTAL IMPLEMENTED Savings:
$22,666
Cost:
$14,656
- - - - $22,666 - - - - - -
-
kWh
-
-
kW-months/year
$22,666
-
$
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Ancillary Material Cost