Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1999 |
Principal Product | Custon hardwood furniture pieces |
NAICS | n/a |
SIC | 2431 - Millwork |
Sales | $10,000,000-$50,000,000 |
# of Employees | 162 |
Plant Area (Sq.Ft.) | 138,000 |
Annual Production | 3,500 Thousand Feet |
Production Hrs. Annual | 6,452 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $84,081 | 3,362,544 | kWh | $0.03 |
Electricity Demand | $106,450 | 10,797 | kW-months/year | $9.86 |
Natural Gas | $35,131 | 8,127 | MMBtu | $4.32 |
TOTAL ENERGY COSTS | $269,515 | |||
RECOMMENDED SAVINGS* | $294,478 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,666 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $22,666 Cost: $14,656 |
- | - | - | - | $22,666 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$22,666 - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $742 Cost: $65 |
$428 | 16,999 | $314 | 32 | - | - | - | - | - | - |
$428 16,999 kWh |
$314 32 kW-months/year |
- - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
Savings: $135,070 Cost: $761,380 |
$78,416 | 2,862,837 | $41,950 | - | - | - | $14,704 | 8,860,500 | - | - |
$78,416 2,862,837 kWh |
$41,950 - kW-months/year |
- - $ |
$14,704 8,860,500 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $136,000 Cost: $143,925 |
- | - | - | - | - | - | - | - | $136,000 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - lb |
$136,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $294,478 Cost: $920,026 |
$78,844 | 2,879,836 | $42,264 | 32 | $22,666 | - | $14,704 | 8,860,500 | $136,000 | - | $78,844 2,879,836 kWh |
$42,264 32 kW-months/year |
$22,666 - $ |
$14,704 8,860,500 lb |
$136,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,666 Cost: $14,656 |
- | - | - | - | $22,666 | - | - | - | - | - | - - kWh |
- - kW-months/year |
$22,666 - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Ancillary Material Cost |