Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1999 |
Principal Product | Winches, couplings, trailer jacks |
NAICS | n/a |
SIC | 3531 - Construction Machinery |
Sales | $10,000,000-$50,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 1,062,500 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $48,423 | 1,569,754 | kWh | $0.03 |
Electricity Demand | $23,747 | 5,321 | kW-months/year | $4.46 |
Natural Gas | $50,135 | 12,815 | MMBtu | $3.91 |
TOTAL ENERGY COSTS | $161,048 | |||
RECOMMENDED SAVINGS* | $80,022 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $62,180 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,233 Cost: $20 |
$734 | 24,033 | $499 | 112 | - | - | - | - | - | - |
$734 24,033 kWh |
$499 112 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $480 Cost: $131 |
$323 | 10,551 | $157 | 35 | - | - | - | - | - | - |
$323 10,551 kWh |
$157 35 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.2111 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE |
Savings: $11,305 Cost: $800 |
$2,505 | 187,866 | - | - | - | - | $8,800 | - | - | - |
$2,505 187,866 kWh |
- - kW-months/year |
- - lb |
$8,800 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $4,824 Cost: - |
- | - | - | - | $4,824 | 230,400 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,824 230,400 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS |
Savings: $62,180 Cost: $300 |
- | - | - | - | - | - | - | - | $62,180 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$62,180 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $80,022 Cost: $1,251 |
$3,562 | 222,450 | $656 | 147 | $4,824 | 230,400 | $8,800 | - | $62,180 | - | $3,562 222,450 kWh |
$656 147 kW-months/year |
$4,824 230,400 lb |
$8,800 - $ |
$62,180 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $62,180 Cost: $300 |
- | - | - | - | - | - | - | - | $62,180 | - | - - kWh |
- - kW-months/year |
- - lb |
- - $ |
$62,180 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | One-time Revenue or Avoided Cost |