IAC logo
IAC Assessment: UL0244
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0244
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2000
Principal Product Ice Cream
NAICS n/a
SIC 2024 - Ice Cream And Frozen Desserts
Sales $10,000,000-$50,000,000
# of Employees 124
Plant Area (Sq.Ft.) 51,533
Annual Production 9,000 Thousand Gallons
Production Hrs. Annual 6,096
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $286,973 8,589,391 kWh $0.03
Electricity Demand $26,413 17,385 kW-months/year $1.52
Natural Gas $22,510 6,500 MMBtu $3.46
TOTAL ENERGY COSTS $335,896
RECOMMENDED SAVINGS* $219,196 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$376
Cost:
$13
$334 9,965 $42 28 - - - - - - $334
9,965
kWh
$42
28
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$280
Cost:
$20
$246 7,327 $34 22 - - - - - - $246
7,327
kWh
$34
22
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
03: 3.4155 METER WASTE WATER Savings:
$29,300
Cost:
$2,858
- - - - $29,300 4,391,600 - - - - -
-
kWh
-
-
kW-months/year
$29,300
4,391,600
Tgal
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,542
Cost:
-
- - - - - - $3,542 9,180 - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$3,542
9,180
lb
-
-
$
05: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$185,698
Cost:
$181,234
- - - - - - - - $185,698 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$185,698
-
$
TOTAL RECOMMENDED Savings:
$219,196
Cost:
$184,125
$580 17,292 $76 50 $29,300 4,391,600 $3,542 9,180 $185,698 - $580
17,292
kWh
$76
50
kW-months/year
$29,300
4,391,600
Tgal
$3,542
9,180
lb
$185,698
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost