IAC logo
IAC Assessment: UL2214
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2214
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2022
Principal Product Automotive interior carpet and inlayment
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 250,000
Annual Production 1,164,949 Units
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $147,034 3,486,000 kWh $0.04
Electricity Demand $194,647 12,043 kW-months/year $16.16
Electricity Fees $39,090 - $ -
Natural Gas $10,213 1,064 MMBtu $9.59
TOTAL ENERGY COSTS $390,984
RECOMMENDED SAVINGS* $119,402 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$67,238
Cost:
$1,046,392
$38,754 918,805 $28,484 1,762 - - $38,754
918,805
kWh
$28,484
1,762
kW-months/year
-
-
MMBtu
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$43,721
Cost:
$432,345
$25,591 606,744 $18,130 1,122 - - $25,591
606,744
kWh
$18,130
1,122
kW-months/year
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,475
Cost:
-
$1,346 32,051 $1,129 70 - - $1,346
32,051
kWh
$1,129
70
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$626
Cost:
$3,993
$626 14,916 - - - - $626
14,916
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,543
Cost:
-
$1,543 36,574 - - - - $1,543
36,574
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,187
Cost:
$1,760
$3,187 75,873 - - - - $3,187
75,873
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$612
Cost:
-
$108 2,579 - - $504 53 $108
2,579
kWh
-
-
kW-months/year
$504
53
MMBtu
TOTAL RECOMMENDED Savings:
$119,402
Cost:
$1,484,490
$71,155 1,687,542 $47,743 2,954 $504 53 $71,155
1,687,542
kWh
$47,743
2,954
kW-months/year
$504
53
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas