IAC logo
IAC Assessment: UL2316
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2316
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2023
Principal Product Hair Care Products
NAICS 325620 - Toilet Preparation Manufacturing
SIC 2844 - Toilet Preparations
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 682,976
Annual Production 2,700,000 Units
Production Hrs. Annual 7,488
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,175,467 18,902,219 kWh $0.06
Electricity Demand $568,348 40,877 kW-months/year $13.90
Electricity Fees $245,182 - $ -
Natural Gas $202,836 76,659 MMBtu $2.65
TOTAL ENERGY COSTS $2,191,833
RECOMMENDED SAVINGS* $503,856 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$14,992
Cost:
-
$12,457 200,928 $2,535 182 - - $12,457
200,928
kWh
$2,535
182
kW-months/year
-
-
MMBtu
02: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$73,247
Cost:
$137,300
$73,247 1,177,851 - - - - $73,247
1,177,851
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$112,167
Cost:
$989,084
$76,486 1,229,942 $35,681 2,566 - - $76,486
1,229,942
kWh
$35,681
2,566
kW-months/year
-
-
MMBtu
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$7,026
Cost:
-
$5,890 94,995 - - $1,136 429 $5,890
94,995
kWh
-
-
kW-months/year
$1,136
429
MMBtu
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$15,036
Cost:
$20,000
$15,036 242,511 - - - - $15,036
242,511
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.9131 INSTALL HYDROGEN FUEL CELL Savings:
$281,388
Cost:
$1,750,000
$271,560 4,426,419 $83,400 6,000 $(-73,572) (-27,763) $271,560
4,426,419
kWh
$83,400
6,000
kW-months/year
$(-73,572)
(-27,763)
MMBtu
TOTAL RECOMMENDED Savings:
$503,856
Cost:
$2,896,384
$454,676 7,372,646 $121,616 8,748 $(-72,436) (-27,334) $454,676
7,372,646
kWh
$121,616
8,748
kW-months/year
$(-72,436)
(-27,334)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas