IAC logo
IAC Assessment: UL2413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2024
Principal Product Distilled Spirits
NAICS 312140 - Distilleries
SIC 2085 - Distilled And Blended Liquors
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 108,850
Annual Production 7,315 Thousand Gallons
Production Hrs. Annual 8,400
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $613,745 10,261,500 kWh $0.06
Electricity Demand $147,575 21,173 kW-months/year $6.97
Electricity Fees $230,742 - $ -
Natural Gas $1,003,592 235,429 MMBtu $4.26
TOTAL ENERGY COSTS $1,995,654
RECOMMENDED SAVINGS* $366,407 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$894
Cost:
$5,000
$894 14,950 - - - - - - $894
14,950
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$45,007
Cost:
$52,000
- - - - $45,007 10,565 - - -
-
kWh
-
-
kW-months/year
$45,007
10,565
MMBtu
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,471
Cost:
$19,500
$20,471 342,265 - - - - - - $20,471
342,265
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$96,023
Cost:
$1,156,200
$79,563 1,330,260 $16,460 2,383 - - - - $79,563
1,330,260
kWh
$16,460
2,383
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$204,012
Cost:
$328,582
$112,128 1,874,685 $52,680 7,557 - - $39,204 4,656 $112,128
1,874,685
kWh
$52,680
7,557
kW-months/year
-
-
MMBtu
$39,204
4,656
Tgal
TOTAL RECOMMENDED Savings:
$366,407
Cost:
$1,561,282
$213,056 3,562,160 $69,140 9,940 $45,007 10,565 $39,204 4,656 $213,056
3,562,160
kWh
$69,140
9,940
kW-months/year
$45,007
10,565
MMBtu
$39,204
4,656
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage