Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2025
Principal Product Thermoplastic Resins
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $50,000,000-$100,000,000
# of Employees 105
Plant Area (Sq.Ft.) 210,000
Annual Production 10,660 Tons
Production Hrs. Annual 8,736
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $441,213 15,713,600 kWh $0.03
Electricity Demand $654,795 34,997 kW-months/year $18.71
Electricity Fees $104,024 - $ -
Natural Gas $521,928 252,045 MMBtu $2.07
TOTAL ENERGY COSTS $1,721,960
RECOMMENDED SAVINGS* $192,001 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$77,396
Cost:
$40,000
- - - - - - $77,396 31,335 -
-
kWh
-
-
kW-months/year
-
-
$
$77,396
31,335
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,455
Cost:
$2,940
$4,455 158,539 - - - - - - $4,455
158,539
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$43,343
Cost:
$86,469
$22,731 803,796 $20,612 1,104 - - - - $22,731
803,796
kWh
$20,612
1,104
kW-months/year
-
-
$
-
-
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$49,775
Cost:
$25,480
- - - - $49,775 - - - -
-
kWh
-
-
kW-months/year
$49,775
-
$
-
-
MMBtu
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$13,709
Cost:
$151,700
$6,345 225,990 $7,364 394 - - - - $6,345
225,990
kWh
$7,364
394
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,323
Cost:
$17,116
$3,323 118,330 - - - - - - $3,323
118,330
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$192,001
Cost:
$323,705
$36,854 1,306,655 $27,976 1,498 $49,775 - $77,396 31,335 $36,854
1,306,655
kWh
$27,976
1,498
kW-months/year
$49,775
-
$
$77,396
31,335
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas