Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 1998 |
Principal Product | Stamped Automotive Parts |
NAICS | n/a |
SIC | 3465 - Automotive Stampings |
Sales | $1,000,000-$5,000,000 |
# of Employees | 48 |
Plant Area (Sq.Ft.) | 72,000 |
Annual Production | 3,500,000 Pounds |
Production Hrs. Annual | 5,304 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $129,033 | 740,328 | kWh | $0.17 |
Electricity Fees | $(-1,194) | - | $ | - |
Natural Gas | $8,356 | 2,085 | MMBtu | $4.01 |
TOTAL ENERGY COSTS | $136,195 | |||
RECOMMENDED SAVINGS* | $31,403 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,112 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $2,335 Cost: $250 |
- | - | - | - | - | - | - | - | $2,335 | - |
- - kWh |
- - MMBtu |
- - lb |
- - $ |
$2,335 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,860 Cost: $1,000 |
$1,860 | 18,757 | - | - | - | - | - | - | - | - |
$1,860 18,757 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $8,029 Cost: $1,000 |
$8,029 | 80,891 | - | - | - | - | - | - | - | - |
$8,029 80,891 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,783 Cost: $100 |
$1,783 | 17,878 | - | - | - | - | - | - | - | - |
$1,783 17,878 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $962 Cost: $1,500 |
- | - | $962 | 240 | - | - | - | - | - | - |
- - kWh |
$962 240 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $14,994 Cost: $5,000 |
- | - | - | - | $11,472 | 12,480 | $3,522 | - | - | - |
- - kWh |
- - MMBtu |
$11,472 12,480 lb |
$3,522 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $1,440 Cost: $518 |
- | - | - | - | - | - | $1,440 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$1,440 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $31,403 Cost: $9,368 |
$11,672 | 117,526 | $962 | 240 | $11,472 | 12,480 | $4,962 | - | $2,335 | - | $11,672 117,526 kWh |
$962 240 MMBtu |
$11,472 12,480 lb |
$4,962 - $ |
$2,335 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,112 Cost: $2,618 |
$11,672 | 117,526 | - | - | - | - | $1,440 | - | - | - | $11,672 117,526 kWh |
- - MMBtu |
- - lb |
$1,440 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes |