IAC logo
IAC Assessment: UM0125
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0125
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1998
Principal Product Aluminum Recycling
NAICS n/a
SIC 3341 - Secondary Nonferrous Metals
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 85,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 6,120
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $211,612 2,181,712 kWh $0.10
Electricity Fees $8,053 - $ -
Natural Gas $324,000 102,000 MMBtu $3.18
TOTAL ENERGY COSTS $543,665
RECOMMENDED SAVINGS* $410,440 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $148,776
#|Description Savings
Cost
Status Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Fees Natural Gas Personnel Changes Administrative Changes
$ $ $ MMBtu $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$12,144
Cost:
$250
$12,144 - - - - - - - $12,144
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$47,135
Cost:
$3,000
- - $47,135 14,822 - - - - -
-
$
$47,135
14,822
MMBtu
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$89,497
Cost:
$25,000
- - $89,497 32,075 - - - - -
-
$
$89,497
32,075
MMBtu
-
-
$
-
-
$
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$250,120
Cost:
$1,500,000
- - - - $250,120 - - - -
-
$
-
-
MMBtu
$250,120
-
$
-
-
$
05: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$11,544
Cost:
$24,180
- - - - - - $11,544 - -
-
$
-
-
MMBtu
-
-
$
$11,544
-
$
TOTAL RECOMMENDED Savings:
$410,440
Cost:
$1,552,430
$12,144 - $136,632 46,897 $250,120 - $11,544 - $12,144
-
$
$136,632
46,897
MMBtu
$250,120
-
$
$11,544
-
$
TOTAL IMPLEMENTED Savings:
$148,776
Cost:
$28,250
$12,144 - $136,632 46,897 - - - - $12,144
-
$
$136,632
46,897
MMBtu
-
-
$
-
-
$
Savings
Cost
$ $ $ MMBtu $ $ $ $
Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Fees Natural Gas Personnel Changes Administrative Changes