Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 1999 |
Principal Product | Graphite |
NAICS | n/a |
SIC | 3295 - Minerals, Ground Or Treated |
Sales | $5,000,000-$10,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 15,000,000 Pounds |
Production Hrs. Annual | 2,080 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $79,393 | 815,651 | kWh | $0.10 |
Electricity Fees | $3,972 | - | $ | - |
Natural Gas | $15,285 | 2,717 | MMBtu | $5.63 |
TOTAL ENERGY COSTS | $98,650 | |||
RECOMMENDED SAVINGS* | $85,159 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,790 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $662 Cost: - |
$662 | 17,878 | - | - | - | - | - | - | - | - |
$662 17,878 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $1,970 Cost: - |
- | - | $1,970 | 350 | - | - | - | - | - | - |
- - kWh |
$1,970 350 MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $1,200 Cost: $3,500 |
- | - | - | - | $1,200 | 937,500 | - | - | - | - |
- - kWh |
- - MMBtu |
$1,200 937,500 Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $11,820 Cost: - |
- | - | - | - | - | - | $11,820 | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$11,820 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $3,807 Cost: - |
- | - | $3,807 | - | - | - | - | - | - | - |
- - kWh |
$3,807 - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE |
Savings: $65,700 Cost: $123,450 |
- | - | - | - | - | - | - | - | $65,700 | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
$65,700 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $85,159 Cost: $126,950 |
$662 | 17,878 | $5,777 | 350 | $1,200 | 937,500 | $11,820 | - | $65,700 | - | $662 17,878 kWh |
$5,777 350 MMBtu |
$1,200 937,500 Tgal |
$11,820 - lb |
$65,700 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,790 Cost: - |
- | - | $1,970 | 350 | - | - | $11,820 | - | - | - | - - kWh |
$1,970 350 MMBtu |
- - Tgal |
$11,820 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes |