Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 1999 |
Principal Product | Processed Steel Coils |
NAICS | n/a |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 370,420 |
Annual Production | 34,000 Tons |
Production Hrs. Annual | 4,160 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $343,779 | 12,051,583 | kWh | $0.03 |
Electricity Demand | $570,907 | 33,864 | kW-months/year | $16.86 |
Electricity Fees | $(-21,002) | - | $ | - |
Natural Gas | $639,862 | 151,567 | MMBtu | $4.22 |
TOTAL ENERGY COSTS | $1,533,546 | |||
RECOMMENDED SAVINGS* | $315,502 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $18,168 Cost: $780 |
$8,884 | 316,237 | $9,284 | 912 | - | - | - | - | - | - | - | - |
$8,884 316,237 kWh |
$9,284 912 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,110 Cost: $600 |
$877 | 29,601 | $1,233 | 87 | - | - | - | - | - | - | - | - |
$877 29,601 kWh |
$1,233 87 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS |
Savings: $27,426 Cost: $13,000 |
- | - | - | - | $27,426 | 6,499 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$27,426 6,499 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $2,688 Cost: $3,600 |
- | - | - | - | $2,688 | 637 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,688 637 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS |
Savings: $225,811 Cost: $90,000 |
- | - | - | - | - | - | $225,811 | 698,139 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$225,811 698,139 gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $2,613 Cost: - |
- | - | - | - | - | - | - | - | $2,613 | 137,030 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$2,613 137,030 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $36,686 Cost: - |
- | - | - | - | - | - | - | - | - | - | $36,686 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$36,686 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $315,502 Cost: $107,980 |
$9,761 | 345,838 | $10,517 | 999 | $30,114 | 7,136 | $225,811 | 698,139 | $2,613 | 137,030 | $36,686 | - | $9,761 345,838 kWh |
$10,517 999 kW-months/year |
$30,114 7,136 MMBtu |
$225,811 698,139 gal |
$2,613 137,030 lb |
$36,686 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | By-product Production |