Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1999
Principal Product Processed Steel Coils
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 370,420
Annual Production 34,000 Tons
Production Hrs. Annual 4,160
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $343,779 12,051,583 kWh $0.03
Electricity Demand $570,907 33,864 kW-months/year $16.86
Electricity Fees $(-21,002) - $ -
Natural Gas $639,862 151,567 MMBtu $4.22
TOTAL ENERGY COSTS $1,533,546
RECOMMENDED SAVINGS* $315,502 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) By-product Production
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$18,168
Cost:
$780
$8,884 316,237 $9,284 912 - - - - - - - - $8,884
316,237
kWh
$9,284
912
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,110
Cost:
$600
$877 29,601 $1,233 87 - - - - - - - - $877
29,601
kWh
$1,233
87
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS Savings:
$27,426
Cost:
$13,000
- - - - $27,426 6,499 - - - - - - -
-
kWh
-
-
kW-months/year
$27,426
6,499
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$2,688
Cost:
$3,600
- - - - $2,688 637 - - - - - - -
-
kWh
-
-
kW-months/year
$2,688
637
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$225,811
Cost:
$90,000
- - - - - - $225,811 698,139 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$225,811
698,139
gal
-
-
lb
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,613
Cost:
-
- - - - - - - - $2,613 137,030 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$2,613
137,030
lb
-
-
$
07: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$36,686
Cost:
-
- - - - - - - - - - $36,686 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$36,686
-
$
TOTAL RECOMMENDED Savings:
$315,502
Cost:
$107,980
$9,761 345,838 $10,517 999 $30,114 7,136 $225,811 698,139 $2,613 137,030 $36,686 - $9,761
345,838
kWh
$10,517
999
kW-months/year
$30,114
7,136
MMBtu
$225,811
698,139
gal
$2,613
137,030
lb
$36,686
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) By-product Production