IAC logo
IAC Assessment: UM0142
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0142
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1999
Principal Product Aluminum and Zinc Die Castings
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 90,000
Annual Production 3,500,000 Pounds
Production Hrs. Annual 6,000
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,076 4,897,714 kWh $0.02
Electricity Demand $148,365 12,276 kW-months/year $12.09
Electricity Fees $17,701 - $ -
Natural Gas $320,346 92,396 MMBtu $3.47
TOTAL ENERGY COSTS $565,488
RECOMMENDED SAVINGS* $269,213 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,047
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption Increase in Production
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ %
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$416
Cost:
$450
$416 24,619 - - - - - - - - - - $416
24,619
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
%
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,691
Cost:
$1,250
$1,631 114,009 $3,060 228 - - - - - - - - $1,631
114,009
kWh
$3,060
228
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
%
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$39
Cost:
-
$39 2,345 - - - - - - - - - - $39
2,345
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
%
04: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$55,979
Cost:
$38,958
- - - - - - $55,979 16,132 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$55,979
16,132
MMBtu
-
-
Tgal
-
-
%
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$44,187
Cost:
$52,200
- - - - - - $44,187 12,734 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$44,187
12,734
MMBtu
-
-
Tgal
-
-
%
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,489
Cost:
$10,860
- - - - $7,489 - - - - - - - -
-
kWh
-
-
kW-months/year
$7,489
-
$
-
-
MMBtu
-
-
Tgal
-
-
%
07: 3.4155 METER WASTE WATER Savings:
$6,412
Cost:
$500
- - - - - - - - $6,412 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$6,412
-
Tgal
-
-
%
08: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$150,000
Cost:
$150,000
- - - - - - - - - - $150,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$150,000
-
%
TOTAL RECOMMENDED Savings:
$269,213
Cost:
$254,218
$2,086 140,973 $3,060 228 $7,489 - $100,166 28,866 $6,412 - $150,000 - $2,086
140,973
kWh
$3,060
228
kW-months/year
$7,489
-
$
$100,166
28,866
MMBtu
$6,412
-
Tgal
$150,000
-
%
TOTAL IMPLEMENTED Savings:
$19,047
Cost:
$13,060
$2,086 140,973 $3,060 228 $7,489 - - - $6,412 - - - $2,086
140,973
kWh
$3,060
228
kW-months/year
$7,489
-
$
-
-
MMBtu
$6,412
-
Tgal
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ %
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption Increase in Production