IAC logo
IAC Assessment: UM0149
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0149
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1999
Principal Product Metal Fittings
NAICS n/a
SIC 3451 - Screw Machine Products
Sales $5,000,000-$10,000,000
# of Employees 91
Plant Area (Sq.Ft.) 51,000
Annual Production 6,110,846 Pieces
Production Hrs. Annual 4,386
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,423 1,293,669 kWh $0.04
Electricity Demand $16,033 4,476 kW-months/year $3.58
Electricity Fees $580 - $ -
Natural Gas $5,723 1,050 MMBtu $5.45
TOTAL ENERGY COSTS $76,759
RECOMMENDED SAVINGS* $377,187 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,954
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $ $ %
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$836
Cost:
$500
$678 16,120 $158 44 - - - - - - - - - - - - $678
16,120
kWh
$158
44
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
%
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$618
Cost:
$200
$500 12,016 $118 33 - - - - - - - - - - - - $500
12,016
kWh
$118
33
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
%
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,322
Cost:
$1,500
- - - - - - $2,322 426 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,322
426
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
%
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,107
Cost:
$10,500
$4,627 110,199 $1,933 540 - - $(-2,453) (-450) - - - - - - - - $4,627
110,199
kWh
$1,933
540
kW-months/year
-
-
$
$(-2,453)
(-450)
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
%
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,804
Cost:
-
- - - - $3,804 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,804
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
%
06: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER Savings:
$8,500
Cost:
$40,000
- - - - - - - - $3,850 5,500 $(-490) - $5,140 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,850
5,500
gal
$(-490)
-
$
$5,140
-
$
-
-
%
07: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$357,000
Cost:
$714,000
- - - - - - - - - - - - - - $357,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$357,000
-
%
TOTAL RECOMMENDED Savings:
$377,187
Cost:
$766,700
$5,805 138,335 $2,209 617 $3,804 - $(-131) (-24) $3,850 5,500 $(-490) - $5,140 - $357,000 - $5,805
138,335
kWh
$2,209
617
kW-months/year
$3,804
-
$
$(-131)
(-24)
MMBtu
$3,850
5,500
gal
$(-490)
-
$
$5,140
-
$
$357,000
-
%
TOTAL IMPLEMENTED Savings:
$9,954
Cost:
$40,700
$1,178 28,136 $276 77 - - - - $3,850 5,500 $(-490) - $5,140 - - - $1,178
28,136
kWh
$276
77
kW-months/year
-
-
$
-
-
MMBtu
$3,850
5,500
gal
$(-490)
-
$
$5,140
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $ $ %
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Increase in Production