IAC logo
IAC Assessment: UM0156
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0156
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2000
Principal Product Paint Related Products
NAICS n/a
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 122
Plant Area (Sq.Ft.) 120,000
Annual Production 10,000 Thousand Gallons
Production Hrs. Annual 4,680
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,018 2,534,584 kWh $0.03
Electricity Demand $117,464 7,128 kW-months/year $16.48
Electricity Fees $(-1,125) - $ -
Natural Gas $239,498 50,840 MMBtu $4.71
TOTAL ENERGY COSTS $430,855
RECOMMENDED SAVINGS* $90,199 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,274
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Consumption One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$428
Cost:
$500
$314 4,103 $114 5 - - - - - - $314
4,103
kWh
$114
5
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7122 DISCONNECT BALLASTS Savings:
$1,786
Cost:
-
$1,786 60,375 - - - - - - - - $1,786
60,375
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,860
Cost:
$48,600
$4,960 167,644 $5,900 414 - - - - - - $4,960
167,644
kWh
$5,900
414
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$1,813
Cost:
$4,430
- - - - $1,813 305 - - - - -
-
kWh
-
-
kW-months/year
$1,813
305
MMBtu
-
-
Tgal
-
-
$
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$9,420
Cost:
$880
- - - - $9,420 2,000 - - - - -
-
kWh
-
-
kW-months/year
$9,420
2,000
MMBtu
-
-
Tgal
-
-
$
06: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$7,640
Cost:
$6,500
- - - - $7,640 1,622 - - - - -
-
kWh
-
-
kW-months/year
$7,640
1,622
MMBtu
-
-
Tgal
-
-
$
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$19,310
Cost:
$7,000
- - - - - - $19,310 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$19,310
-
Tgal
-
-
$
08: 4.632 CHANGE OPERATING CONDITIONS Savings:
$38,942
Cost:
$20,000
- - - - - - - - $38,942 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$38,942
-
$
TOTAL RECOMMENDED Savings:
$90,199
Cost:
$87,910
$7,060 232,122 $6,014 419 $18,873 3,927 $19,310 - $38,942 - $7,060
232,122
kWh
$6,014
419
kW-months/year
$18,873
3,927
MMBtu
$19,310
-
Tgal
$38,942
-
$
TOTAL IMPLEMENTED Savings:
$19,274
Cost:
$7,880
$2,100 64,478 $114 5 $17,060 3,622 - - - - $2,100
64,478
kWh
$114
5
kW-months/year
$17,060
3,622
MMBtu
-
-
Tgal
-
-
$