IAC Assessment: UM0159
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0159
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2000
Principal Product Aluminum Castings
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $50,000,000-$100,000,000
# of Employees 235
Plant Area (Sq.Ft.) 80,000
Annual Production 1,250,000 Tons
Production Hrs. Annual 6,000
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $500,539 14,041,618 kWh $0.04
Electricity Demand $244,320 26,016 kW-months/year $9.39
Electricity Fees $25,239 - $ -
Natural Gas $389,722 129,649 MMBtu $3.01
TOTAL ENERGY COSTS $1,199,420
RECOMMENDED SAVINGS* $206,171 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $110,445
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,800
Cost:
$200
$1,800 50,410 - - - - - - $1,800
50,410
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$172
Cost:
$50
$115 3,224 $57 6 - - - - $115
3,224
kWh
$57
6
kW-months/year
-
-
MMBtu
-
-
gal
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$10,836
Cost:
$3,000
- - - - $10,836 3,600 - - -
-
kWh
-
-
kW-months/year
$10,836
3,600
MMBtu
-
-
gal
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$4,390
Cost:
$4,000
- - - - $4,390 1,649 - - -
-
kWh
-
-
kW-months/year
$4,390
1,649
MMBtu
-
-
gal
05: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$4,800
Cost:
$8,000
- - - - $4,800 1,600 - - -
-
kWh
-
-
kW-months/year
$4,800
1,600
MMBtu
-
-
gal
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$88,447
Cost:
$27,000
- - - - $88,447 29,384 - - -
-
kWh
-
-
kW-months/year
$88,447
29,384
MMBtu
-
-
gal
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$95,726
Cost:
$35,000
- - - - - - $95,726 259,200 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$95,726
259,200
gal
TOTAL RECOMMENDED Savings:
$206,171
Cost:
$77,250
$1,915 53,634 $57 6 $108,473 36,233 $95,726 259,200 $1,915
53,634
kWh
$57
6
kW-months/year
$108,473
36,233
MMBtu
$95,726
259,200
gal
TOTAL IMPLEMENTED Savings:
$110,445
Cost:
$42,250
$1,915 53,634 $57 6 $108,473 36,233 - - $1,915
53,634
kWh
$57
6
kW-months/year
$108,473
36,233
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz)