IAC logo
IAC Assessment: UM0161
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0161
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2000
Principal Product Tubular Assemblies
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 70,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,839 2,269,930 kWh $0.10
Electricity Fees $(-4,767) - $ -
Natural Gas $41,449 10,241 MMBtu $4.05
TOTAL ENERGY COSTS $262,521
RECOMMENDED SAVINGS* $58,530 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,802
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,365
Cost:
$450
$1,365 14,068 - - - - $1,365
14,068
kWh
-
-
$
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,614
Cost:
$500
$2,614 26,964 - - - - $2,614
26,964
kWh
-
-
$
-
-
MMBtu
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$48,437
Cost:
$500
- - $48,437 - - - -
-
kWh
$48,437
-
$
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,098
Cost:
$656
- - - - $1,098 43 -
-
kWh
-
-
$
$1,098
43
MMBtu
05: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$5,016
Cost:
$5,700
$5,016 52,462 - - - - $5,016
52,462
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$58,530
Cost:
$7,806
$8,995 93,494 $48,437 - $1,098 43 $8,995
93,494
kWh
$48,437
-
$
$1,098
43
MMBtu
TOTAL IMPLEMENTED Savings:
$49,802
Cost:
$950
$1,365 14,068 $48,437 - - - $1,365
14,068
kWh
$48,437
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas