Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2000 |
Principal Product | Acoustical Pads |
NAICS | n/a |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $10,000,000-$50,000,000 |
# of Employees | 209 |
Plant Area (Sq.Ft.) | 132,000 |
Annual Production | 32,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $351,252 | 9,231,243 | kWh | $0.04 |
Electricity Demand | $207,786 | 23,064 | kW-months/year | $9.01 |
Electricity Fees | $79,299 | - | $ | - |
Natural Gas | $104,752 | 29,564 | MMBtu | $3.54 |
TOTAL ENERGY COSTS | $743,089 | |||
RECOMMENDED SAVINGS* | $70,118 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $30,000 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,316 Cost: $500 |
$2,230 | 59,789 | $1,086 | 119 | - | - | - | - | - | - |
$2,230 59,789 kWh |
$1,086 119 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,563 Cost: $50 |
$2,394 | 64,185 | $1,169 | 128 | - | - | - | - | - | - |
$2,394 64,185 kWh |
$1,169 128 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,733 Cost: $600 |
$2,510 | 67,116 | $1,223 | 134 | - | - | - | - | - | - |
$2,510 67,116 kWh |
$1,223 134 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $225 Cost: $750 |
- | - | - | - | $225 | 75 | - | - | - | - |
- - kWh |
- - kW-months/year |
$225 75 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $6,353 Cost: $7,000 |
- | - | - | - | $6,353 | 1,884 | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,353 1,884 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,328 Cost: $2,500 |
- | - | - | - | $1,328 | 375 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,328 375 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $30,000 Cost: $5,000 |
- | - | - | - | - | - | - | - | $30,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$30,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $21,600 Cost: $5,000 |
- | - | - | - | - | - | $21,600 | 2,704,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$21,600 2,704,000 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $70,118 Cost: $21,400 |
$7,134 | 191,090 | $3,478 | 381 | $7,906 | 2,334 | $21,600 | 2,704,000 | $30,000 | - | $7,134 191,090 kWh |
$3,478 381 kW-months/year |
$7,906 2,334 MMBtu |
$21,600 2,704,000 Tgal |
$30,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $30,000 Cost: $5,000 |
- | - | - | - | - | - | - | - | $30,000 | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$30,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost |