Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2000 |
Principal Product | Aluminum Castings |
NAICS | n/a |
SIC | 3365 - Aluminum Foundries |
Sales | $1,000,000-$5,000,000 |
# of Employees | 25 |
Plant Area (Sq.Ft.) | 23,000 |
Annual Production | 854,000 Pounds |
Production Hrs. Annual | 3,120 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $138,643 | 1,799,531 | kWh | $0.08 |
Electricity Fees | $6,672 | - | $ | - |
Natural Gas | $12,086 | 2,739 | MMBtu | $4.41 |
TOTAL ENERGY COSTS | $157,401 | |||
RECOMMENDED SAVINGS* | $29,950 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,274 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Primary Product | Electricity Usage | Natural Gas | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,136 Cost: $3,600 |
$4,136 | 59,203 | - | - | - | - |
$4,136 59,203 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $5,460 Cost: $490 |
$5,460 | 77,960 | - | - | - | - |
$5,460 77,960 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,906 Cost: $1,200 |
$5,906 | 59,496 | - | - | - | - |
$5,906 59,496 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,038 Cost: $500 |
- | - | $1,038 | 261 | - | - |
- - kWh |
$1,038 261 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $530 Cost: $350 |
- | - | $530 | 138 | - | - |
- - kWh |
$530 138 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $5,080 Cost: $25,000 |
- | - | $5,080 | 1,152 | - | - |
- - kWh |
$5,080 1,152 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $7,800 Cost: $2,000 |
- | - | - | - | $7,800 | - |
- - kWh |
- - MMBtu |
$7,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $29,950 Cost: $33,140 |
$15,502 | 196,659 | $6,648 | 1,551 | $7,800 | - | $15,502 196,659 kWh |
$6,648 1,551 MMBtu |
$7,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,274 Cost: $4,050 |
$5,906 | 59,496 | $1,568 | 399 | $7,800 | - | $5,906 59,496 kWh |
$1,568 399 MMBtu |
$7,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Primary Product | Electricity Usage | Natural Gas | Primary Product |