IAC logo
IAC Assessment: UM0181
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0181
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2001
Principal Product Heat Treating
NAICS n/a
SIC 3398 - Metal Heat Treating
Sales $5,000,000-$10,000,000
# of Employees 58
Plant Area (Sq.Ft.) 150,000
Annual Production 120,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,289 3,580,910 kWh $0.03
Electricity Demand $74,673 8,460 kW-months/year $8.83
Electricity Fees $4,189 - $ -
Natural Gas $672,750 178,159 MMBtu $3.78
TOTAL ENERGY COSTS $847,901
RECOMMENDED SAVINGS* $102,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost
$ kWh $ MMBtu $ $
01: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$300
Cost:
$300
$300 11,400 - - - - $300
11,400
kWh
-
-
MMBtu
-
-
$
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$3,470
Cost:
$3,540
- - $3,470 760 - - -
-
kWh
$3,470
760
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$94,100
Cost:
$71,000
- - $94,100 24,900 - - -
-
kWh
$94,100
24,900
MMBtu
-
-
$
04: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$4,520
Cost:
$8,000
- - - - $4,520 - -
-
kWh
-
-
MMBtu
$4,520
-
$
TOTAL RECOMMENDED Savings:
$102,390
Cost:
$82,840
$300 11,400 $97,570 25,660 $4,520 - $300
11,400
kWh
$97,570
25,660
MMBtu
$4,520
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost