Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2001 |
Principal Product | Malted Beverages |
NAICS | n/a |
SIC | 2082 - Malt Beverages |
Sales | $5,000,000-$10,000,000 |
# of Employees | 20 |
Plant Area (Sq.Ft.) | 39,000 |
Annual Production | 388 Thousand Gallons |
Production Hrs. Annual | 2,600 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $80,060 | 1,153,576 | kWh | $0.07 |
Electricity Demand | $21,950 | 3,192 | kW-months/year | $6.88 |
Electricity Fees | $1,672 | - | $ | - |
Natural Gas | $15,260 | 4,237 | MMBtu | $3.60 |
TOTAL ENERGY COSTS | $145,042 | |||
RECOMMENDED SAVINGS* | $26,360 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2112 USE CORRECT SIZE STEAM TRAPS |
Savings: $2,880 Cost: $2,500 |
- | - | $2,880 | 800 | - | - | - | - |
- - kWh |
$2,880 800 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,400 Cost: $1,200 |
$1,400 | 19,924 | - | - | - | - | - | - |
$1,400 19,924 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $700 Cost: $3,000 |
$700 | 7,325 | - | - | - | - | - | - |
$700 7,325 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $780 Cost: $1,000 |
- | - | - | - | $780 | 312,000 | - | - |
- - kWh |
- - MMBtu |
$780 312,000 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4151 MINIMIZE WATER USAGE |
Savings: $2,400 Cost: $5,000 |
- | - | - | - | $2,400 | 410,000 | - | - |
- - kWh |
- - MMBtu |
$2,400 410,000 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $4,900 Cost: $7,400 |
$900 | 9,962 | - | - | - | - | $4,000 | - |
$900 9,962 kWh |
- - MMBtu |
- - Tgal |
$4,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $2,500 Cost: $1,000 |
- | - | - | - | - | - | $2,500 | - |
- - kWh |
- - MMBtu |
- - Tgal |
$2,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $10,800 Cost: $14,400 |
- | - | - | - | - | - | $10,800 | - |
- - kWh |
- - MMBtu |
- - Tgal |
$10,800 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,360 Cost: $35,500 |
$3,000 | 37,211 | $2,880 | 800 | $3,180 | 722,000 | $17,300 | - | $3,000 37,211 kWh |
$2,880 800 MMBtu |
$3,180 722,000 Tgal |
$17,300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Electricity Usage | Natural Gas | Water Disposal | Personnel Changes |