IAC Assessment: UM0184
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0184
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2001
Principal Product Reconstituted Wood Products
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $50,000,000-$100,000,000
# of Employees 193
Plant Area (Sq.Ft.) 400,000
Annual Production 270,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,103,630 81,200,763 kWh $0.03
Electricity Demand $445,198 136,980 kW-months/year $3.25
Electricity Fees $597,421 - $ -
Natural Gas $1,103,570 271,749 MMBtu $4.06
TOTAL ENERGY COSTS $4,249,819
RECOMMENDED SAVINGS* $102,300 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $87,250
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,250
Cost:
$3,000
$3,291 111,340 $4,959 348 - - - - $3,291
111,340
kWh
$4,959
348
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,900
Cost:
$15,000
$3,900 100,792 - - - - - - $3,900
100,792
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,550
Cost:
$1,600
- - - - $1,550 381 - - -
-
kWh
-
-
kW-months/year
$1,550
381
MMBtu
-
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$25,000
Cost:
$13,700
- - - - $25,000 5,288 - - -
-
kWh
-
-
kW-months/year
$25,000
5,288
MMBtu
-
-
$
05: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$56,800
Cost:
$75,000
- - - - $56,800 14,000 - - -
-
kWh
-
-
kW-months/year
$56,800
14,000
MMBtu
-
-
$
06: 4.632 CHANGE OPERATING CONDITIONS Savings:
$6,800
Cost:
$11,000
- - - - - - $6,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,800
-
$
TOTAL RECOMMENDED Savings:
$102,300
Cost:
$119,300
$7,191 212,132 $4,959 348 $83,350 19,669 $6,800 - $7,191
212,132
kWh
$4,959
348
kW-months/year
$83,350
19,669
MMBtu
$6,800
-
$
TOTAL IMPLEMENTED Savings:
$87,250
Cost:
$105,300
$3,900 100,792 - - $83,350 19,669 - - $3,900
100,792
kWh
-
-
kW-months/year
$83,350
19,669
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost