IAC logo
IAC Assessment: UM0201
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0201
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2002
Principal Product Rolled Aluminum Sheet
NAICS n/a
SIC 3353 - Aluminum Sheet, Plate, And Foil
Sales n/a
# of Employees 957
Plant Area (Sq.Ft.) 1,333,650
Annual Production 710,000 Tons
Production Hrs. Annual 8,736
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $12,339,480 423,395,083 kWh $0.03
Electricity Demand $380,557 62,002 kW-months/year $6.14
Electricity Fees $220,474 - $ -
Natural Gas $16,427,926 2,724,213 MMBtu $6.03
TOTAL ENERGY COSTS $29,368,437
RECOMMENDED SAVINGS* $2,061,547 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$972,000
Cost:
$3,390,000
- - $972,000 161,000 -
-
kWh
$972,000
161,000
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$493,600
Cost:
$1,060,000
- - $493,600 81,800 -
-
kWh
$493,600
81,800
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$519,147
Cost:
$1,100,000
$290,000 9,493,200 $229,147 38,000 $290,000
9,493,200
kWh
$229,147
38,000
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$76,800
Cost:
$348,000
- - $76,800 12,750 -
-
kWh
$76,800
12,750
MMBtu
TOTAL RECOMMENDED Savings:
$2,061,547
Cost:
$5,898,000
$290,000 9,493,200 $1,771,547 293,550 $290,000
9,493,200
kWh
$1,771,547
293,550
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas