Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2002 |
Principal Product | Organic Chemicals |
NAICS | n/a |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 210 |
Plant Area (Sq.Ft.) | 140,000 |
Annual Production | 120,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $441,178 | 19,529,920 | kWh | $0.02 |
Electricity Demand | $532,669 | 2,562 | kW-months/year | $207.91 |
Electricity Fees | $63,151 | - | $ | - |
Natural Gas | $2,070,352 | 897,124 | MMBtu | $2.31 |
TOTAL ENERGY COSTS | $3,415,600 | |||
RECOMMENDED SAVINGS* | $189,258 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Other Liquid (non-haz) | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Other Liquid (non-haz) | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | gal | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $100,000 Cost: $5,000 |
- | - | - | - | - | - | - | - | $100,000 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - gal |
$100,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $39,500 Cost: $121,500 |
- | - | - | - | - | - | $39,500 | 64,281 | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$39,500 64,281 gal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $35,341 Cost: $105,000 |
$20,376 | 902,000 | $14,965 | 864 | - | - | - | - | - | - |
$20,376 902,000 kWh |
$14,965 864 kW-months/year |
- - Tgal |
- - gal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT |
Savings: $10,650 Cost: $26,000 |
- | - | - | - | $10,650 | 1,801,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,650 1,801,000 Tgal |
- - gal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,767 Cost: $525 |
$1,530 | 61,457 | $2,237 | 157 | - | - | - | - | - | - |
$1,530 61,457 kWh |
$2,237 157 kW-months/year |
- - Tgal |
- - gal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $189,258 Cost: $258,025 |
$21,906 | 963,457 | $17,202 | 1,021 | $10,650 | 1,801,000 | $39,500 | 64,281 | $100,000 | - | $21,906 963,457 kWh |
$17,202 1,021 kW-months/year |
$10,650 1,801,000 Tgal |
$39,500 64,281 gal |
$100,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - Tgal |
- - gal |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | gal | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Other Liquid (non-haz) | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Other Liquid (non-haz) | Increase in Production |