IAC logo
IAC Assessment: UM0217
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0217
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2002
Principal Product Heat Treatment
NAICS n/a
SIC 3398 - Metal Heat Treating
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 15,000
Annual Production 10,000 Units
Production Hrs. Annual 6,240
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,415 1,251,495 kWh $0.06
Electricity Demand $12,353 654 kW-months/year $18.89
Electricity Fees $(-405) - $ -
Natural Gas $28,730 5,558 MMBtu $5.17
TOTAL ENERGY COSTS $116,093
RECOMMENDED SAVINGS* $9,332 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,906
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$396
Cost:
$75
$158 6,887 $238 13 - - - - $158
6,887
kWh
$238
13
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$310
Cost:
$600
$130 5,255 $180 10 - - - - $130
5,255
kWh
$180
10
kW-months/year
-
-
MMBtu
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$800
Cost:
$1,170
$800 34,913 - - - - - - $800
34,913
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$290
Cost:
$680
$290 30,128 - - - - - - $290
30,128
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,326
Cost:
$2,100
- - - - $2,326 405 - - -
-
kWh
-
-
kW-months/year
$2,326
405
MMBtu
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$300
Cost:
$50
$300 4,992 - - - - - - $300
4,992
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$2,860
Cost:
$2,500
- - - - - - $2,860 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,860
-
$
08: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$2,050
Cost:
$1,350
- - - - $2,050 400 - - -
-
kWh
-
-
kW-months/year
$2,050
400
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$9,332
Cost:
$8,525
$1,678 82,175 $418 23 $4,376 805 $2,860 - $1,678
82,175
kWh
$418
23
kW-months/year
$4,376
805
MMBtu
$2,860
-
$
TOTAL IMPLEMENTED Savings:
$5,906
Cost:
$5,205
$578 42,270 $418 23 $2,050 400 $2,860 - $578
42,270
kWh
$418
23
kW-months/year
$2,050
400
MMBtu
$2,860
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes