IAC Assessment: UM0233
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0233
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2003
Principal Product Plating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 50,000
Annual Production 6,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $270,439 6,067,279 kWh $0.04
Electricity Demand $62,268 4,373 kW-months/year $14.24
Electricity Fees $9,707 - $ -
Natural Gas $72,466 11,381 MMBtu $6.37
TOTAL ENERGY COSTS $493,129
RECOMMENDED SAVINGS* $72,646 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,846
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$41,800
Cost:
$32,000
- - - - $27,900 4,382 $13,900 3,600,000 - - -
-
kWh
-
-
kW-months/year
$27,900
4,382
MMBtu
$13,900
3,600,000
Tgal
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,064
Cost:
$500
- - - - $2,064 324 - - - - -
-
kWh
-
-
kW-months/year
$2,064
324
MMBtu
-
-
Tgal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,745
Cost:
$150
$1,061 23,892 $684 48 - - - - - - $1,061
23,892
kWh
$684
48
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,037
Cost:
$50
$629 14,113 $408 28 - - - - - - $629
14,113
kWh
$408
28
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$26,000
Cost:
$119,000
$(-800) (-18,000) $(-520) (-36) - - $28,820 7,467,000 $(-1,500) - $(-800)
(-18,000)
kWh
$(-520)
(-36)
kW-months/year
-
-
MMBtu
$28,820
7,467,000
Tgal
$(-1,500)
-
$
TOTAL RECOMMENDED Savings:
$72,646
Cost:
$151,700
$890 20,005 $572 40 $29,964 4,706 $42,720 11,067,000 $(-1,500) - $890
20,005
kWh
$572
40
kW-months/year
$29,964
4,706
MMBtu
$42,720
11,067,000
Tgal
$(-1,500)
-
$
TOTAL IMPLEMENTED Savings:
$30,846
Cost:
$119,700
$890 20,005 $572 40 $2,064 324 $28,820 7,467,000 $(-1,500) - $890
20,005
kWh
$572
40
kW-months/year
$2,064
324
MMBtu
$28,820
7,467,000
Tgal
$(-1,500)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost