Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2003 |
Principal Product | Plating |
NAICS | 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471 - Plating And Polishing |
Sales | $10,000,000-$50,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 6,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $270,439 | 6,067,279 | kWh | $0.04 |
Electricity Demand | $62,268 | 4,373 | kW-months/year | $14.24 |
Electricity Fees | $9,707 | - | $ | - |
Natural Gas | $72,466 | 11,381 | MMBtu | $6.37 |
TOTAL ENERGY COSTS | $493,129 | |||
RECOMMENDED SAVINGS* | $72,646 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $30,846 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $41,800 Cost: $32,000 |
- | - | - | - | $27,900 | 4,382 | $13,900 | 3,600,000 | - | - |
- - kWh |
- - kW-months/year |
$27,900 4,382 MMBtu |
$13,900 3,600,000 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,064 Cost: $500 |
- | - | - | - | $2,064 | 324 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,064 324 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,745 Cost: $150 |
$1,061 | 23,892 | $684 | 48 | - | - | - | - | - | - |
$1,061 23,892 kWh |
$684 48 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,037 Cost: $50 |
$629 | 14,113 | $408 | 28 | - | - | - | - | - | - |
$629 14,113 kWh |
$408 28 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $26,000 Cost: $119,000 |
$(-800) | (-18,000) | $(-520) | (-36) | - | - | $28,820 | 7,467,000 | $(-1,500) | - |
$(-800) (-18,000) kWh |
$(-520) (-36) kW-months/year |
- - MMBtu |
$28,820 7,467,000 Tgal |
$(-1,500) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $72,646 Cost: $151,700 |
$890 | 20,005 | $572 | 40 | $29,964 | 4,706 | $42,720 | 11,067,000 | $(-1,500) | - | $890 20,005 kWh |
$572 40 kW-months/year |
$29,964 4,706 MMBtu |
$42,720 11,067,000 Tgal |
$(-1,500) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $30,846 Cost: $119,700 |
$890 | 20,005 | $572 | 40 | $2,064 | 324 | $28,820 | 7,467,000 | $(-1,500) | - | $890 20,005 kWh |
$572 40 kW-months/year |
$2,064 324 MMBtu |
$28,820 7,467,000 Tgal |
$(-1,500) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost |