IAC Assessment: UM0291
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0291
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2005
Principal Product Piston Rings
NAICS 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3592 - Carburetors, Pistons, Rings, Valves
Sales $50,000,000-$100,000,000
# of Employees 320
Plant Area (Sq.Ft.) 150,000
Annual Production 120,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $607,091 16,603,459 kWh $0.04
Electricity Demand $283,844 34,138 kW-months/year $8.31
Electricity Fees $13,123 - $ -
Natural Gas $332,223 42,942 MMBtu $7.74
TOTAL ENERGY COSTS $1,236,281
RECOMMENDED SAVINGS* $53,247 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,563
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$20,293
Cost:
$9,000
- - - - $20,293 2,543 - - -
-
kWh
-
-
kW-months/year
$20,293
2,543
MMBtu
-
-
Tgal
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$18,138
Cost:
$19,073
$(-1,091) (-29,828) $(-1,487) (-179) - - $20,716 - $(-1,091)
(-29,828)
kWh
$(-1,487)
(-179)
kW-months/year
-
-
MMBtu
$20,716
-
Tgal
03: 2.2514 COVER OPEN TANKS Savings:
$4,518
Cost:
$2,366
- - - - $4,421 488 $97 - -
-
kWh
-
-
kW-months/year
$4,421
488
MMBtu
$97
-
Tgal
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,427
Cost:
$1,900
$1,795 49,098 $1,632 196 - - - - $1,795
49,098
kWh
$1,632
196
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,841
Cost:
$1,490
$(-16) (-298) - - $2,857 358 - - $(-16)
(-298)
kWh
-
-
kW-months/year
$2,857
358
MMBtu
-
-
Tgal
06: 2.7493 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES Savings:
$2,309
Cost:
$39,000
$537 14,688 - - $1,772 222 - - $537
14,688
kWh
-
-
kW-months/year
$1,772
222
MMBtu
-
-
Tgal
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,325
Cost:
$1,265
- - - - $1,325 166 - - -
-
kWh
-
-
kW-months/year
$1,325
166
MMBtu
-
-
Tgal
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$396
Cost:
$150
$396 10,836 - - - - - - $396
10,836
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$53,247
Cost:
$74,244
$1,621 44,496 $145 17 $30,668 3,777 $20,813 - $1,621
44,496
kWh
$145
17
kW-months/year
$30,668
3,777
MMBtu
$20,813
-
Tgal
TOTAL IMPLEMENTED Savings:
$29,563
Cost:
$14,531
$1,795 49,098 $1,632 196 $26,039 3,197 $97 - $1,795
49,098
kWh
$1,632
196
kW-months/year
$26,039
3,197
MMBtu
$97
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption